Let us pick the right pros for you Get Started

Addition & Remodeling Contractors in Bowie, MD (Maryland)

Deals Tag = Deals
(443) 200-7769
5460 Thunder Hill Road
Columbia, MD 21045

Serving Bowie
We are United Home Remodelers, Inc., our goal is to serve our clients by being a true professional ...
See More
(866) 693-8592
12811 Duley Station Road
Upper Marlboro, MD 20772

Serving Bowie
Building Trades Specialists, LLC, is a design build company of professional craftsman. We are ...
See More
References Available
(301) 960-0611
10595 Furnace Road, Suite 100
Lorton, VA 22079

Serving Bowie
Patio Enclosures – Washington, by Great Day Improvements offers 1- stop shopping for all of your ...
See More
Find the Right Pro. Right Away.

Let our ProFinder technology instantly match you to the perfect pros for your project.

Showing 1-25 of 49
< Prev | 1 | 2 | Next >

Recent Job Requests for Additions & Remodeling Contractors in Bowie, MD


New Lead
Project: Remodel or Renovate One or More Rooms
Location: Bowie, MD
Date: 08/27/2014
Design Preparation: None
Rooms to be Remodeled: Basement
Rooms to be Remodeled: Kitchen
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Desired Completion Date: Less than 2 months
Request Stage: Ready to Hire
Property Owner: Yes
Nature of project: Remodel / update a few rooms
Comment: Our kitchen is outdated and needs to be completed renovated. This is our first priority to get completed. While out here, we also want to get a quote to have our basement finished. We may, depending on price, have them done at the same time or the basement done later this year but they both need to be completed. Please call.

New Lead
Project: Remodel a Bathroom
Location: Bowie, MD
Date: 08/26/2014
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Desired Completion Date: Less than 2 months
Request Stage: Ready to Hire
Requires Work on Historical Structure: No
Request for Commercial Location: No
Covered by Insurance: No
Property Owner: Yes
Comment: Remove and replace tile in bathroom, replace commode.

New Lead
Project: Remodel a Basement
Location: Bowie, MD
Date: 08/25/2014
Design Preparation: None
Basement Features: Bathroom(s)
Basement Features: Bedroom(s)
Basement Area Description: Unfinished
Square Footage: 400 - 800 (medium)
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Desired Completion Date: Less than 2 months
Request Stage: Planning & Budgeting
Property Owner: Yes

New Lead
Project: Build an Addition
Location: Bowie, MD
Date: 08/25/2014
Desired Completion Date: More than 2 months
Request Stage: Planning & Budgeting
Type of Addition: Ground level addition
Requires Work on Historical Structure: No
Request for Commercial Location: No
Project Description: Build - Use existing architectural drawings
Rooms Included:: Bedroom(s)
Rooms Included:: Common area(s)
Property Owner: Yes
Comment: adding a mastersuite and a sun room

New Lead
Project: Remodel a Basement
Location: Bowie, MD
Date: 08/25/2014
What kind of location is this?: Home/Residence
Desired Completion Date: Timing is flexible
Request Stage: Ready to Hire
Comment: Need estimate to remode basement

New Lead
Project: Remodel a Kitchen
Location: Bowie, MD
Date: 08/24/2014
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: No - I do not plan to move or update the appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Lighting: No - I do not plan to update the lighting
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Property Owner: Yes
Comment: I plan to update my kitchen before the end of the year. I'd like to talk to an expert and get an estimate. I'm just starting my research. I'd like 42" cabinets, granite countertops, with hardware.

New Lead
Project: Remodel a Bathroom
Location: Bowie, MD
Date: 08/24/2014
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting

New Lead
Project: Add a Sunroom or Patio Enclosure
Location: Bowie, MD
Date: 08/24/2014
Project Description: Build a new sunroom or enclosed patio or porch
What kind of location is this?: Home/Residence
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Property Owner: Yes
Comment: 18 x 24 Sunroom addition for single family home. To include electricity and skylights.

Project: Renovate or Repair a Home
Location: Bowie, MD
Date: 08/21/2014
What kind of location is this?: Home/Residence
Historical Work: No
Desired Completion Date: More than 2 months
Request Stage: Planning & Budgeting
Project Type: Both
Property Owner: No
Project Description: Major renovation
Work included: Cabinets
Work included: Carpentry-finish
Work included: Countertops
Work included: Drywall
Work included: Electrical
Work included: Flooring
Work included: Framing
Work included: Heating and cooling
Work included: Insulation
Work included: Plumbing
Work included: Siding
Work included: Tile

Project: Remodel a Bathroom
Location: Bowie, MD
Date: 08/21/2014
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Desired Completion Date: Less than 2 months
Request Stage: Ready to Hire
Requires Work on Historical Structure: No
Request for Commercial Location: No
Covered by Insurance: No
Property Owner: Yes
Comment: Replace tloor tiles in small bathroom, reinstall toilet, and install new 24" vanity. Side bordering tiles are needed.

Unscreened Additions & Remodeling Contractors in Bowie

Always Done Right Enterprises LLC
5901 Columbian Way
Bowie, MD 20715
Give Praises Electrical

Bowie, MD 20715
Solomon Crozier Constr Inc
10111 Martin Luther King Jr
Bowie, MD 20720
CSR General Contractors Inc.
12000 Tweed Ln
Bowie, MD 20715
Bradley Home & Pool
4019 Chelmont Lane
Bowie, MD 20715
RemodelandSave.com

Bowie, MD 20715
ATR & ASSOC
11611 SILVERGATE LN
Bowie, MD 20720
lts home improvements

Bowie, MD 20715