Let us pick the right pros for you Get Started

Addition & Remodeling Contractors in Harleysville, PA (Pennsylvania)

Deals Tag = Deals
References Available
(267) 573-6214
613 Rickert Road
Sellersville, PA 18960

Serving Harleysville
James Mohan Construction has been servicing the local area since 2005. Give us a call today for a ...
See More
(215) 239-9338
245 Taylor Ally
Phoenixville, PA 19460

Serving Harleysville
At Emerald Kitchen and Bath we are courteous, trustworthy, skilled craftsmen who specialize in ...
See More
(267) 573-5297
404 Leidy Road
Souderton, PA 18964

Serving Harleysville
Borek Construction Inc. is a local company that provides general construction and remodeling ...
See More
Find the Right Pro. Right Away.

Let our ProFinder technology instantly match you to the perfect pros for your project.

Showing 1-25 of 78
< Prev | 1 | 2 | 3 | 4 | Next >

Recent Job Requests for Additions & Remodeling Contractors in Harleysville, PA


New Lead
Project: Remodel a Kitchen
Location: Harleysville, PA
Date: 07/2015
Floorplan: I am considering changes to kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: Yes - I plan to update the lighting
What kind of location is this?: Home/Residence
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Comment: This mobile user did not provide any additional comments.

New Lead
Project: Remodel a Bathroom
Location: Harleysville, PA
Date: 07/2015
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Desired Completion Date: Less than 2 months
Request Stage: Planning & Budgeting
Requires Work on Historical Structure: No
Request for Commercial Location: No
Covered by Insurance: No
Property Owner: Yes
Comment: 16x9 foot section of a 16x21 foot bedroom has an exposed accessible bathroom section and second door to an adjacent office; 1) remove existing jacuzzi, sink, toilet, and flooring and door/frame next to existing small 4x2 closet; 2) remove small 2-sided section of 6"x6" wall tile shower backsplash, 3) keep existing sink water and jacuzzi shower wall/drain connections but install roll-in accessible shower with 2 glass/half-tiled sides and new water temperature sensing (set) fixtures (no grab bars), 4) install new accessible sink (integral to an extended to shower wall 4 foot counter) and new faucet fixtures/above counter mirror cabinets accessible from a wheelchair; 5) tear down existing 4 foot closet to create a 10x5.5 foot walk-in closet with painted white shelving and new ceiling light built-up from an existing half wall that has a room return vent already installed; 6) Wall-in the currently open bathroom (11 foot section that meets the new closet) with bathroom entry pocke

New Lead
Project: Remodel a Bathroom
Location: Harleysville, PA
Date: 07/2015
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Desired Completion Date: Less than 2 months
Request Stage: Planning & Budgeting
Requires Work on Historical Structure: No
Request for Commercial Location: No
Covered by Insurance: No
Property Owner: Yes
Comment: 16x9 foot section of a 16x21 foot bedroom has an exposed accessible bathroom section and second door to an adjacent office; 1) remove existing jacuzzi, sink, toilet, and flooring and door/frame next to existing small 4x2 closet; 2) remove small 2-sided section of 6"x6" wall tile shower backsplash, 3) keep existing sink water and jacuzzi shower wall/drain connections but install roll-in accessible shower with 2 glass/half-tiled sides and new water temperature sensing (set) fixtures (no grab bars but , 4) install new accessible sink (integral to an extended to shower wall 4 foot counter) and new faucet fixtures/above counter mirror cabinets accessible from a wheelchair; 5) tear down existing 4 foot closet to create a 10x5.5 foot walk-in closet with painted white shelving and new ceiling light built-up from an existing half wall that has a room return vent already installed; 6) Wall-in the currently open bathroom (11 foot section that meets the new closet) with bathroom entry p

Project: Remodel a Bathroom
Location: Harleysville, PA
Date: 07/2015
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Desired Completion Date: Less than 2 months
Request Stage: Planning & Budgeting
Requires Work on Historical Structure: No
Request for Commercial Location: No
Covered by Insurance: No
Property Owner: Yes
Comment: Update bathroom. Completely redo shower. New vanity and top. New tile floor and new tile around a jacuzzi bathtub

Project: Remodel a Garage
Location: Harleysville, PA
Date: 07/2015
Scope of Remodel: Completely remodel garage
Storage cabinets / shelving: Yes - I plan to add or update the cabinets / shelving
Insulation: Yes - I plan to add insulation
Flooring: Yes - I plan to update the flooring
Electrical: Yes - I plan to update the lighting or electrical fixtures
Interior walls or drywall: Yes - I plan to add or remove walls or drywall
What kind of location is this?: Home/Residence
Garage doors: Yes - I plan to update the garage doors
Desired Completion Date: More than 2 months
Request Stage: Planning & Budgeting
Comment: Make garage into living room with divider wall.for a bedroom.and add bathroom. French doors where garage door was, new back.door and add a side door.

Project: Remodel a Basement
Location: Harleysville, PA
Date: 07/2015
Design Preparation: None
Basement Features: Bedroom(s)
Basement Features: Storage
Basement Features: Home Theater
Basement Area Description: Unfinished
Square Footage: More than 800 (large)
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Desired Completion Date: Less than 2 months
Request Stage: Ready to Hire
Property Owner: Yes
Comment: I would like to finish my basement to add some storage and a possibly a room/office area.

Project: Remodel a Bathroom
Location: Harleysville, PA
Date: 07/2015
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Desired Completion Date: Less than 2 months
Request Stage: Ready to Hire
Requires Work on Historical Structure: No
Request for Commercial Location: No
Covered by Insurance: No
Property Owner: Yes
Comment: It's a very small powder room on main floor

Project: Remodel a Bathroom
Location: Harleysville, PA
Date: 06/2015
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Comment: This mobile user did not provide any additional comments.

Project: Build an Addition
Location: Harleysville, PA
Date: 06/2015
Desired Completion Date: More than 2 months
Request Stage: Planning & Budgeting
Type of Addition: Ground level addition
Requires Work on Historical Structure: No
Request for Commercial Location: No
Project Description: Design and build
Rooms Included:: Deck/Porch
Property Owner: Yes
Comment: dig up existing 12x20 paver patio and replace with concrete foundation and sunroom

Project: Remodel a Bathroom
Location: Harleysville, PA
Date: 06/2015
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Desired Completion Date: Less than 2 months
Request Stage: Planning & Budgeting
Comment: I am looking to remodel my bathroom. I want to remove the existing shower shell and replace it with tile. I also want to tile the floor, replace the toilet, and install a new vanity

Unscreened Additions & Remodeling Contractors in Harleysville

Branch Valley Assoc
100 Christopher Ln
Harleysville, PA 19438
Integrity Home Maintenance

Harleysville, PA 19438
Koffel Builder Inc.
745 Main St.
Harleysville, PA 19438