Excavation Contractors in Lynn, MA (Massachusetts)

Showing 1-6 of 6
Deals Tag = Offering Special Deals
Find the Right Pro. Right Away.

Let our ProFinder technology instantly match you to the perfect pros for your project.

4.72
3 Verified Ratings
See All Reviews
(978) 747-8047
487 South Main Street
Bradford, MA 01835

Serving Lynn
Since 1981, John James Excavating has been providing our area customers with diligent and...
See More
4.8
15 Verified Ratings
See All Reviews
(617) 449-5728
56 Lincoln Street
Revere, MA 02151

Serving Lynn
D'Errico's Services, is your very best option for all your plumbing needs. We always offer the very...
See More
4.21
4 Verified Ratings
See All Reviews
(978) 747-8026
209 Locust Street
Danvers, MA 01923

Serving Lynn
Since 2000, Davis and Sons Excavating, a family owned and operated company has been taking care of...
See More
4.88
43 Verified Ratings
See All Reviews
(866) 504-6264
33A Williamine Drive
Newton, NH 03858

Serving Lynn
Contact James Donegan, for all of your oil tank removal, installation and replacement services....
See More
4.9
95 Verified Ratings
See All Reviews
(617) 449-9162
PO Box 494
Lynn, MA 01905

You will not need a return trip from us because we do the correct job from the start. We analyze...
See More
4.84
45 Verified Ratings
See All Reviews
(617) 449-5695
PO Box 494
Lynn, MA 01905

You will not need a return trip from us because we do the job right from the start. We analyze the...
See More
Find the Right Pro. Right Away.

Let our ProFinder technology instantly match you to the perfect pros for your project.

Showing 1-6 of 6

Recent Job Requests for Excavation Contractors in Lynn, MA


Project: Install or Replace a Water or Fuel Tank
Location: Lynn, MA
Date: 02/27/2013
Purpose of tank: Petroleum fuel storage
Tank Type: Other
What kind of location is this?: Home/Residence
Desired Completion Date: 1 - 2 weeks
Request Stage: Ready to Hire
Property Owner: Yes
Comment: Need to replace an oil tank

Project: Install or Replace a Water or Fuel Tank
Location: Lynn, MA
Date: 02/24/2013
Purpose of tank: Other
Location of tank: Above ground
Tank Type: Steel
What kind of location is this?: Home/Residence
Desired Completion Date: 1 - 2 weeks
Request Stage: Planning & Budgeting
Property Owner: Yes
Comment: changing the oil tank to my house with labor.

Project: Install or Replace a Water or Fuel Tank
Location: Lynn, MA
Date: 09/23/2012
Purpose of tank: Petroleum fuel storage
Location of tank: Above ground
Tank Type: Steel
What kind of location is this?: Home/Residence
Desired Completion Date: 1 - 2 weeks
Request Stage: Ready to Hire
Property Owner: Yes
Comment: OIL TANK REMOVED AND NEW ONE

Project: Install or Replace a Water or Fuel Tank
Location: Lynn, MA
Date: 09/18/2012
Purpose of tank: Petroleum fuel storage
Location of tank: Above ground
Tank Type: Steel
What kind of location is this?: Home/Residence
Desired Completion Date: More than 2 weeks
Request Stage: Planning & Budgeting
Property Owner: Yes
Comment: OIL TANK

Project: Install or Replace a Water or Fuel Tank
Location: Lynn, MA
Date: 08/29/2012
Purpose of tank: Petroleum fuel storage
Location of tank: Above ground
Tank Type: Steel
What kind of location is this?: Home/Residence
Desired Completion Date: More than 2 weeks
Request Stage: Planning & Budgeting
Property Owner: Yes
Comment: need oil tank--budgets i to done by nov

Project: Install or Replace a Water or Fuel Tank
Location: Lynn, MA
Date: 04/29/2012
Purpose of tank: Petroleum fuel storage
Location of tank: Above ground
Tank Type: Other
What kind of location is this?: Home/Residence
Desired Completion Date: More than 2 weeks
Request Stage: Planning & Budgeting
Property Owner: Yes
Comment: BURNER IS LEAKING

Project: Install or Replace a Water or Fuel Tank
Location: Lynn, MA
Date: 11/18/2011
Purpose of tank: Petroleum fuel storage
Location of tank: Above ground
Tank Type: Steel
What kind of location is this?: Home/Residence
Desired Completion Date: Timing is flexible
Request Stage: Ready to Hire
Property Owner: Yes
Comment: Stand of Fuel tank in my basement is rusty. I want to replace the stand with new one or to make a brick stand for the tank.

Project: Remove a Water or Fuel Tank
Location: Lynn, MA
Date: 04/22/2011
Kind of Tank: Below ground
Material Stored in Tank: Gasoline
How Long Since Tank Was Used: 10+ years
Leakage Details: No
What kind of location is this?: Home/Residence
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Property Owner: Yes
Comment: inspect and mitigate problem posed by undergrond gasoline tank tank unused for 50 pls years . hopefully accomplished by filling with sand

Project: Install or Replace a Water or Fuel Tank
Location: Lynn, MA
Date: 02/16/2011
Purpose of tank: Petroleum fuel storage
Location of tank: Above ground
Tank Type: Steel
What kind of location is this?: Home/Residence
Desired Completion Date: Within 1 week
Request Stage: Planning & Budgeting
Property Owner: Yes
Comment: Need installation of new oil tank and removal of old

Project: Clear Land and Prepare Building Site
Location: Lynn, MA
Date: 11/03/2010
Reason for Clearing: Landscaping
Trees/Structures to Remove: Fences
Trees/Structures to Remove: Other
Trees/Structures to Remove: Tree Stumps
Trees/Structures to Remove: Trees
Topography: Flat
What kind of location is this?: Home/Residence
Financing Requested: No
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Property Owner: Yes
Comment: Taking ownership of adjacent city owned alley (approx 12' wide by 100' long). Need removal of one tree, two tree stumps, chain link and wood fencing and pavement. Some re-grading and some repaving.