Metal Fabrication Contractors in Spokane, WA (Washington)

Recent Job Requests for Metal Fabrication Contractors in Spokane, WA


Project: Install or Replace Metal Stairs and Railings
Location: Spokane, WA
Date: 03/15/2012
Type of Stairs: Interior
Type of Stairs: Straight
Stair Construction: Open on one side (railing on one side, wall on the other)
Type of Material: Stainless Steel
Width of Stairs: 3-5 ft.
What kind of location is this?: Home/Residence
Historical Work: No
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Property Owner: Yes
Comment: Small staircase project near spokane

Project: Install or Replace Metal Stairs and Railings
Location: Spokane, WA
Date: 01/29/2012
What kind of location is this?: Home/Residence
Desired Completion Date: Within 1 week
Request Stage: Ready to Hire
Comment: i need a couple hand rails and an interior banester

Project: Install or Replace Metal Stairs and Railings
Location: Spokane, WA
Date: 12/30/2010
Type of Stairs: Interior
Type of Stairs: Straight
Stair Construction: Open on one side (railing on one side, wall on the other)
Type of Material: Aluminum
What kind of location is this?: Home/Residence
Historical Work: No
Desired Completion Date: More than 2 weeks
Request Stage: Planning & Budgeting
Property Owner: Yes
Comment: stairway currently has no railings open on one side

Project: Install or Replace Metal Stairs and Railings
Location: Spokane, WA
Date: 09/10/2010
What kind of location is this?: Home/Residence
Historical Work: No
Desired Completion Date: Within 1 week
Request Stage: Ready to Hire
Property Owner: Yes
Comment: Install aluminum railings on composite deck

Project: Install or Replace Metal Stairs and Railings
Location: Spokane, WA
Date: 08/29/2010
Type of Stairs: Exterior
Stair Construction: Open on two sides (railings on both sides)
Type of Material: Aluminum
Type of Material: Powder coated
Type of Material: Stainless Steel
Width of Stairs: 3-5 ft.
What kind of location is this?: Home/Residence
Historical Work: No
Desired Completion Date: Within 1 week
Request Stage: Planning & Budgeting
Property Owner: Yes

Project: Weld or Cut Metal with a Torch
Location: Spokane, WA
Date: 07/24/2010
Type of Welding Project: Repair
What item: NA
Location of Welding: Consumer will bring item to shop
What kind of location is this?: Home/Residence
Desired Completion Date: Timing is flexible
Request Stage: Ready to Hire
Comment: Remove and replace with 16 Gauge 4" square tube, 8 ft

Project: Fabricate Sheet Metal (Ducts, Hoods, Ornamental, etc.)
Location: Spokane, WA
Date: 07/10/2010
Fabricate what?: Bird cage pans, replacement panels for RVs
Kind of Metal: Don't Know
How sealed?: Soldered
Copper coated?: No
What kind of location is this?: Home/Residence
Desired Completion Date: Timing is flexible
Request Stage: Ready to Hire
Property Owner: Yes
Comment: Create a bird food catcher that funnels down to a bucket or other removable container to refill feeders for our indoor suspended flight cages housing extremely destructive large breeding parrots

Project: Repair Metal Stairs and Railings
Location: Spokane, WA
Date: 05/20/2010
Type of Stairs: Interior
Type of Stairs: Landing mid-stair
Type of Material: Don't Know
Type of Material: Wrought iron
Description of Problem: New railing needed
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Desired Completion Date: 1 - 2 weeks
Request Stage: Ready to Hire
Property Owner: Yes

Project: Fabricate Custom Metal Objects
Location: Spokane, WA
Date: 05/12/2010
Type of Metal Desired: Wrought iron
Request is for Commercial Location: No
Historical Work: No
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Comment: metal spiral staircase 8' diameter 5'6" 11 risers right hand railing.

Project: Fabricate Custom Metal Objects
Location: Spokane, WA
Date: 05/05/2010
Type of Metal Desired: Wrought iron
Request is for Commercial Location: No
Historical Work: No
Desired Completion Date: Within 1 week
Request Stage: Ready to Hire
Project Descripiton: N/A
Comment: handrails front porch 4 steps

Project: Fabricate Custom Steel Beams
Location: Spokane, WA
Date: 04/27/2010
Consumer Owns Home: Yes
What Beam Supports: Roof and one floor above
Where Beam Used: Supporting floor structure
Deliver beam?: No
Request is for Commercial Location: No
Financing Requested: No
Desired Completion Date: 1 - 2 weeks
Request Stage: Planning & Budgeting