Let us pick the right pros for you Get Started

Mold & Asbestos Services in Chicago, IL (Illinois)

Deals Tag = Deals
Find the Right Pro. Right Away.

Let our ProFinder technology instantly match you to the perfect pros for your project.

Showing 26-42 of 42
< Prev | 1 | 2 | Next >

Recent Job Requests for Mold & Asbestos Services Contractors in Chicago, IL


New Lead
Project: Test Indoor Air Quality
Location: Chicago, IL
Date: 11/28/2014
What kind of location is this?: Home/Residence
Covered by Insurance: No
Desired Completion Date: Within 1 week
Request Stage: Planning & Budgeting
Reason for test: Family member(s) suffer cold, allergy, or asthma symptoms
Reason for test: Just want to have home checked
Reason for test: Odor elimination
Comment: high-rise apartment

New Lead
Project: Eliminate Toxic Materials or Mold
Location: Chicago, IL
Date: 11/28/2014
What kind of location is this?: Home/Residence
Is this an emergency?: No
Covered by Insurance: No
Desired Completion Date: Timing is flexible
Request Stage: Ready to Hire
Tested for Mold: No
Location of Mold: Basement or crawl space
Location of Mold: Interior walls or ceiling
Reason for Removal: Odor
Reason for Removal: Evidence of water / dampness

New Lead
Project: Eliminate Toxic Materials or Mold
Location: Chicago, IL
Date: 11/25/2014
What kind of location is this?: Home/Residence
Is this an emergency?: No
Covered by Insurance: No
Desired Completion Date: Within 1 week
Request Stage: Ready to Hire
Tested for Mold: Yes
Location of Mold: Basement or crawl space
Location of Mold: Ducts and/or heating & air system
Reason for Removal: Odor
Reason for Removal: Just want it removed
Comment: basement removal of mold

New Lead
Project: Eliminate or Contain Toxic Lead
Location: Chicago, IL
Date: 11/25/2014
What kind of location is this?: Home/Residence
Is this an emergency?: No
Desired Completion Date: Timing is flexible
Request Stage: Ready to Hire
Comment: I would like an estimate on testing for lead

New Lead
Project: Eliminate Asbestos
Location: Chicago, IL
Date: 11/24/2014
Nature of Project: Removal / Abatement / Mitigation
What kind of location is this?: Home/Residence
Is this an emergency?: No
Covered by Insurance: No
Desired Completion Date: Timing is flexible
Request Stage: Ready to Hire
Type of toxin: Asbestos
Comment: remove about 260 sq feet of vinyl asbestos tile from 1970 in the family room and hallway on the ground floor of the townhouse, clean cement pad to be ready for installing ceramic tile

New Lead
Project: Test for Toxic Materials & Mold - For Business
Location: Chicago, IL
Date: 11/24/2014
Nature of Project: Testing / Inspection
What kind of location is this?: Home/Residence
Is this an emergency?: No
Covered by Insurance: No
Desired Completion Date: 1 - 2 weeks
Request Stage: Planning & Budgeting
Type of toxin: Mold, mildew, and/or fungus

New Lead
Project: Eliminate Toxic Materials or Mold
Location: Chicago, IL
Date: 11/24/2014
What kind of location is this?: Home/Residence
Is this an emergency?: No
Covered by Insurance: No
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Tested for Mold: No
Location of Mold: Interior walls or ceiling
Reason for Removal: Just want it removed
Comment: Mold has been forming on the painted walls and ceiling above the shower in the bathroom.

New Lead
Project: Test or Evaluate Asbestos Risks
Location: Chicago, IL
Date: 11/23/2014
Home Built Before 1978?: Yes
What Needs Asbestos Testing: Duct insulation
What Needs Asbestos Testing: Flooring
What Needs Asbestos Testing: Pipe insulation
What Needs Asbestos Testing: Soil outdoors
What Needs Asbestos Testing: Wall or ceiling insulation
What kind of location is this?: Home/Residence
Desired Completion Date: Within 1 week
Request Stage: Ready to Hire
Comment: Whole floor in basement is water damaged smells of mildew the water turns black and backs ipbin toilets and sink and my daughter and I throats burn and ears hurt coughing a lot and smells like mildew...

New Lead
Project: Eliminate Asbestos
Location: Chicago, IL
Date: 11/21/2014
What kind of location is this?: Home/Residence
Is this an emergency?: Yes
Desired Completion Date: Within 1 week
Request Stage: Ready to Hire
Comment: I would like a quote to remove asbestos from ductwork.

New Lead
Project: Test for Toxic Materials & Mold
Location: Chicago, IL
Date: 11/21/2014
Reason For Test: Evidence of water / dampness
What kind of location is this?: Home/Residence
Covered by Insurance: No
Desired Completion Date: Within 1 week
Request Stage: Ready to Hire
Suspected Area: Flooring

Unscreened Mold & Asbestos Services Contractors in Chicago

Eason Enviromental
12052 S Union Ave
Chicago, IL 60628