About This Gallery
The entire bathroom was taken down to the studs. Floors were opened up to relocate the drain system and to run hot and cold supplies to the new location. A custom neo angle shower pan was installed. A steam generator was installed. The entire floor, and 4 feet up the walls was tiled.