About This Gallery
The roof was prepared with a high temperature metal roofing underlayment. This will allow the panels to expand and contract and not stick to the roof. 16oz copper roof panels were then secured to the roof decking. The wall flashings were installed into the brick joints that were cut out and re-filled with mortar once the flashings were in place.