Removed a corner tub, bathroom water closet walls. Installed a new designer free-standing shower with glass block walls, two shower heads and tiled the new shower and floor. Moved GIF electrical outlets.
"The Bathroom took a week longer than planned due to no mistakes of the company. The tile work is exceptional as was the quality of our Project Manager. The new bathroom is perfect, we will be doing more work with the company and have already referred the company to one of our friends"