Blackrock Construction LLC

3433 First Av, Jacksonville, FL 32034
(904) 281-8870
Is this your business?
Claim Your Listing
!

Please Note: This business is not a screened and approved member of HomeAdvisor.  Learn about our screening process

Business Information


QUICK FACTS

Business Hours

12:00 am - 12:00 am (Please call to confirm)

  • Free Estimates
  • Credit Cards Accepted
  • Bilingual

SERVICES OFFERED

Additions & Remodeling

SERVICE AREA

Jacksonville

Get Quotes
From up to 3 Prescreened
Additions & Remodeling Pros


 1 Enter ZIP Code

 2 Describe Project

 3 Get Quotes

Service Professional? Join HomeAdvisor to Get Leads Like These

Recent Job Requests for Addition & Remodeling Contractors in Jacksonville, FL:


Project: Remodel a Bathroom
Date: 08/27/2016
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: I have demolished most of my guest bathroom. Backer board removed from tub surround area. Wallpaper removed from drywall, but need help with removing remaining adhesive. All floor tile has been removed. Vanity/sink and toilet have been removed. Need to replace plumbing for removed tub with a new walk-in shower. I have the new vanity/sink/faucet, toilet and shower spray panel for install. I also have a new ceiling vent/light to install. I also have 2 sconce lights for either side of the vanity mirror (don't have mirror yet). I have the tile selected, but not purchased yet. I have identified a reclaimed barn wood product for the long wall opposite the shower - in back of vanity and toilet. I would like some LED can lights installed. I'm looking for a contractor who can put this all together for me as soon as possible. I would like to coordinate a time when you can come to review and develop a proposal. Thank you. - xxxx

Project: Remodel a Bathroom
Date: 08/26/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No

Project: Add a Sunroom or Patio Enclosure
Date: 08/26/2016
Project Description: Build a new sunroom or enclosed patio or porch
Request Stage: Ready to Hire
Desired Completion Date: More than 2 weeks
What kind of location is this?: Home/Residence
Property Owner: Yes
Comment: conservatory

Project: Remodel a Kitchen
Date: 08/26/2016
Desired Completion Date: Timing is flexible
Consumer Owns Home: Yes

Project: Add a Sunroom or Patio Enclosure
Date: 08/26/2016
Project Description: Enclose existing patio or porch with roof, walls or windows
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Property Owner: Yes

Project: Renovate or Repair a Home
Date: 08/26/2016
Project Description: Major renovation
Project Type: Exterior
Work included: Framing
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: Need some floor joist replaced under the house.

Project: Renovate or Repair a Home
Date: 08/26/2016
Project Description: Other
Project Type: Interior
Work included: Drywall, Countertops
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: Tearing out walls and replacing countertops in kitchen

Project: Remodel a Kitchen
Date: 08/26/2016
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Comment: Kitchen remodel

Project: Renovate or Repair a Home
Date: 08/25/2016
Project Description: Other
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
What kind of location is this?: Home/Residence
Comment: Remove wall between kitchen and living room and install wall and door(s) in family room to create bedroom/office.

Project: Remodel a Bathroom
Date: 08/25/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months