Deavours Construction

764 Bowers Loop, Dover, AR 72837
(479) 331-2498
Is this your business?
Claim Your Listing
!

Please Note: This business is not a screened and approved member of HomeAdvisor.  Learn about our screening process

Business Information


QUICK FACTS

Business Hours

12:00 am - 12:00 am (Please call to confirm)

  • Free Estimates
  • Credit Cards Accepted
  • Bilingual

SERVICES OFFERED

Additions & Remodeling

SERVICE AREA

Russellville

Get Quotes
From up to 3 Prescreened
Additions & Remodeling Pros


 1 Enter ZIP Code

 2 Describe Project

 3 Get Quotes

Service Professional? Join HomeAdvisor to Get Leads Like These

Recent Job Requests for Addition & Remodeling Contractors in Dover, AR:


Project: Build an Addition
Location: Dover, AR
Date: 05/2017
Project Description: Design and build
Request Stage: Planning & Budgeting
Comment: I would like to be contacted as soon as possible for an estimate.

Project: Build an Addition
Location: Dover, AR
Date: 01/2017
Project Description: Design and build
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible

Project: Remodel a Bathroom
Location: Dover, AR
Date: 11/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible

Project: Remodel a Bathroom
Location: Dover, AR
Date: 08/2016
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: WE HAVE A VERY SMALL BATHROOM BUT JUST NEEDING TO REMODEL. WE HAVE HAD IRON IN OUR WATER FOR 25 YEARS IN WHICH WE HAVE OWNED THE HOME. I WOULD LIKE TO REMODEL THE BR.

Project: Add a Sunroom or Patio Enclosure
Location: DOVER, AR
Date: 04/2016
Project Description: Build a new sunroom or enclosed patio or porch
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 weeks
What kind of location is this?: Home/Residence
Comment: build a roof over deck

Project: Build an Addition
Location: Dover, AR
Date: 02/2016
Project Description: Design and build
Request Stage: Planning & Budgeting
Comment: addition to existing structure build

Project: Build an Addition
Location: Dover, AR
Date: 01/2016
Project Description: Design and build
Type of Addition: Detached addition
Rooms Included:: Garage/Workshop
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Request for Commercial Location: No
Comment: Please price a 24'x 24'x 8-9' garage with vertical siding and roofing. Wood or metal.

Project: Build an Addition
Location: Dover, AR
Date: 01/2016
Project Description: Design and build
Request Stage: Planning & Budgeting
Comment: want to add adiitional bedroom.

Project: Build an Addition
Location: Dover, AR
Date: 01/2016
Project Description: Design and build
Type of Addition: Detached addition
Rooms Included:: Garage/Workshop
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Request for Commercial Location: No
Comment: Two car garage with a covered area and also room to work inside the garage.

Project: Remodel a Bathroom
Location: Dover, AR
Date: 05/2015
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: Remove fiberglass shower enclosure and replace with tiled shower with half glass wall on one end. Replace 80s green toilet and sinks. Replace tiled floor and countertops.