Moon Ridge Construction & Painting

36882 Ferber Drive, Rancho Mirage, CA 92270
(760) 324-1014
Is this your business?
Claim Your Listing
!

Please Note: This business is not a screened and approved member of HomeAdvisor.  Learn about our screening process

Business Information


QUICK FACTS

Business Hours

12:00 am - 12:00 am (Please call to confirm)

  • Credit Cards Accepted
  • Bilingual

SERVICES OFFERED

Additions & Remodeling

SERVICE AREA

Riverside

CREDENTIALS

State Licensing

Trade:

License #: 685111

Expiration: Tue Mar 30 18:00:00 MDT 2010

State Licensing

Trade:

License #: 685111

Expiration: Tue Mar 30 18:00:00 MDT 2010

BUSINESS OVERVIEW

When it comes to home improvement, look no further than Moon Ridge Construction & Painting. With over 30 years of experience bringing customers' dreams into a reality, we are able to build yours, too!

Get Quotes
From up to 3 Prescreened
Additions & Remodeling Pros


 1 Enter ZIP Code

 2 Describe Project

 3 Get Quotes

Service Professional? Join HomeAdvisor to Get Leads Like These

Recent Job Requests for Addition & Remodeling Contractors in Rancho Mirage, CA:


Project: Remodel a Bathroom
Date: 09/22/2017
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: Reconfigure master bath in order to accommodate wheelchair. Remove oversize tub (appx 6' x 4') and replace with curbless shower. Concrete slab I believe will need to be reduced in order to accommodate curbless shower. Remove two separate 3 foot walls; these appear to be non-bearing walls. Remove existing shower and cap water lines and drain line flush to existing floor. Retile entire floor. This remodel is meant to change the configuration, otherwise the existing counter (vanity), sinks and toilet will remain as they are, although we are flexible on this point when considering the project as a whole. Overall dimensions of master bath are appx 10 ft. x 15 ft.. At least three trades involved that I can see and so I think a general might be advisable for us. ADDRESS: 12 Seton Ct. Rancho Mirage

Project: Remodel a Kitchen
Date: 09/22/2017
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: No - I do not plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: No - I do not plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes
Comment: Selling my single family home. Downsizing to a condo that will need some work and changes.

Project: Renovate or Repair a Home
Date: 09/20/2017
Project Description: Several repair projects of varying nature
Project Type: Both
Work included: Plumbing, Roofing
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes

Project: Remodel a Bathroom
Date: 09/19/2017
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: Reconfigure master bath in order to accommodate wheelchair. Remove oversize tub (appx 6' x 4') and replace with curbless shower. Concrete slab will need to be reduced in order to accommodate curbless shower. Remove two separate 3 foot walls; these appear to be non-bearing walls. Remove existing shower and cap water lines and drain line flush to existing floor. Retile entire floor. This remodel is meant to change the configuration, otherwise the existing counter (vanity) and sinks will remain as they are. Overall dimensions of master bath are appx 10 ft. x 15 ft.. At least three trades involved that I can see and so I think a general contractor might be advisable for us. ADDRESS: 12 Seton Ct. Rancho Mirage

Project: Remodel or Renovate One or More Rooms
Date: 09/18/2017
Project Description: Other
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Comment: Create entrance to attic

Project: Remodel or Renovate One or More Rooms
Date: 09/17/2017
Are you planning to remodel a master bedroom?: No
How many bedrooms do you want to remodel?: 2
How extensively do you want to remodel your bedroom(s)?: I am considering changes to the floorplan
Design Preparation: None
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes
Comment: Need a built-in bookcase moved to another bedroom

Project: Remodel a Bathroom
Date: 09/14/2017
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: Replacing the existing jetted tub and deck. redoing the shower walls, floor, along with glass blocking enclosure. Also may do new bathroom sink's counter top. Cabinets have already been updated. All of bathroom floor tile probably will need to be redone.

Project: Remodel a Kitchen
Date: 09/10/2017
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: No - I do not plan to move or update the cabinets
Appliances: No - I do not plan to move or update the appliances
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Lighting: No - I do not plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Comment: Repair holes in walls at Breakfast area, fill in holes, sand, replace baseboard, paint walls. Repair 2 kitchen drawer fronts.

Project: Remodel or Renovate One or More Rooms
Date: 09/06/2017
Are you planning to remodel a master bedroom?: Yes
How many bedrooms do you want to remodel?: 1
How extensively do you want to remodel your bedroom(s)?: I plan to maintain the existing floorplan
Design Preparation: Sketches and/or basic idea of project
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes
Comment: Walls in master bedroom & dressing room are covered with fabric which needs to be removed. Because there is wallpaper underneath we thought it would be best to just cover the existing walls with 1/4" wallboard, lightly texture and paint. It has 10' high walls. There is approximately 590 sq. ft. of wall space that needs to be finished and a small ceiling patch. xxxxx

Project: Remodel a Bathroom
Date: 09/06/2017
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: Replacing the existing jetted tub and deck. redoing the shower walls, floor, along with glass blocking enclosure. Also may do new bathroom sink's counter top. Cabinets have already been updated. All of bathroom floor tile probably will need to be redone.