Submit and Get Matched to Pre-screened Bathtub Specialists
Install or Replace a Bathtub in Arizona
Top Bathtub Specialists in Arizona
-
Phone: (480) 459-2662
17965 w. palo verde ave, waddell AZ 85355
-
Phone: (602) 567-8016
1612 N West St, Flagstaff AZ 86004
-
Phone: (480) 459-2782
2993 West Dancer Lane, Queen Creek AZ 85042
-
Phone: (480) 567-9321
21111 North 91st Drive, Peoria AZ 85382
-
Phone: (702) 824-9747
22840 South Tweedy Road, Eloy AZ 85131
Recent Job Leads for Arizona Bathtub Specialists
-
Project Location: Tucson AZ
Date: 05/20/2013
Bathtub: Install a new bathtub (No existing bathtub)
Historical Work: No
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Property Owner: Yes
Comment: Customer is calling to get a quote for bathtub to be installed
Project Location: Gilbert AZ
Date: 05/17/2013
What kind of location is this?: Home/Residence
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Project Location: Buckeye AZ
Date: 05/16/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Are you updating a shower or a bathtub?: Bathtub
Desired Completion Date: More than 2 months
Request Stage: Ready to Hire
Comment: I need to replace/convert my bathtub to shower..
Project Location: Tucson AZ
Date: 05/16/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Are you updating a shower or a bathtub?: Both
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Comment: Would like to re-surface tub and stand up shower...or replace?
Project Location: Scottsdale AZ
Date: 05/16/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Are you updating a shower or a bathtub?: Both
Desired Completion Date: Less than 2 months
Request Stage: Ready to Hire
Comment: Remodeling two master bathrooms (shower enclosures, bath tub, etc.).