Window AC

Submit and Get Matched to Pre-screened Window A/C Unit Contractors

Install a Window Air Conditioning Unit in California

ZIP/Postal Code (Location of Request): *
Where would you like the air conditioner installed?
Is there electrical power nearby for the air conditioner?
Step   Step 1 Step 2 Step 3   -  Describe Your Install a Window Air Conditioning Unit Need in California

Top Window A/C Unit Contractors in California

Recent Job Leads for California Window A/C Unit Contractors

  • new lead
    Project Location: Sherman Oaks CA
    Date: 05/16/2013
    Installation location: Wall mounted
    Nearby power: Yes
    Materials Provided by Homeowner: No
    Desired Completion Date: Within 1 week
    Request Stage: Ready to Hire
    Property Owner: Yes
  • new lead
    Project Location: Winnetka CA
    Date: 05/15/2013
    Installation location: In window opening
    Nearby power: No
    Materials Provided by Homeowner: Yes
    Desired Completion Date: Within 1 week
    Request Stage: Ready to Hire
    Property Owner: Yes
    Comment: fridgiere 18,000 BTU unit and 220 volt power installation
  • new lead
    Project Location: Sherman Oaks CA
    Date: 05/15/2013
    Installation location: Wall mounted
    Nearby power: Yes
    Materials Provided by Homeowner: No
    Desired Completion Date: Within 1 week
    Request Stage: Ready to Hire
    Property Owner: Yes
    Comment: mini split inverter unit is already installed and operational. Inside unit was not installed properly - hoses. Water leaks inside and their is likely a very small refrigerant leak. Task is properly remount inside unit and charge if needed.
  • new lead
    Project Location: Sherman Oaks CA
    Date: 05/13/2013
    Installation location: Wall mounted
    Nearby power: Yes
    Materials Provided by Homeowner: Yes
    Desired Completion Date: Within 1 week
    Request Stage: Ready to Hire
    Property Owner: Yes
  • new lead
    Project Location: Pacoima CA
    Date: 05/13/2013
    Installation location: In window opening
    Nearby power: Yes
    Materials Provided by Homeowner: No
    Desired Completion Date: Within 1 week
    Request Stage: Planning & Budgeting
    Property Owner: Yes