Swimming Pool Remodel

Submit and Get Matched to Pre-screened Swimming Pool Contractors

Remodel a Swimming Pool in Colorado

ZIP/Postal Code (Location of Request): *
What type of pool will be remodeled?
What primary material is the pool surface made of?
Select the features your are considering for your pool remodel:
Step   Step 1 Step 2 Step 3   -  Describe Your Remodel a Swimming Pool Need in Colorado

Top Swimming Pool Contractors in Colorado

  • Phone: (720) 506-6590

    429 South Ivy Street, Denver CO 80224

Recent Job Leads for Colorado Swimming Pool Contractors

  • new lead
    Project Location: Englewood CO
    Date: 08/26/2014
    Type of Pool: In ground
    Pool Material: Concrete
    Remodel to Include: Plumbing or electrical beneath pool deck
    What kind of location is this?: Business
    Desired Completion Date: 1 - 2 weeks
    Request Stage: Ready to Hire
    Property Owner: Yes
    Comment: A brake in supply line
  • Project Location: Littleton CO
    Date: 06/2014
    Type of Pool: In ground
    Pool Material: Vinyl
    Remodel to Include: New tile / coping
    Remodel to Include: New pool deck
    Remodel to Include: Pool lights
    What kind of location is this?: Home/Residence
    Desired Completion Date: More than 2 weeks
    Request Stage: Planning & Budgeting
    Property Owner: Yes
    Comment: Replace pump, resurface deck, replace slide, pool lights
  • Project Location: Parker CO
    Date: 06/2014
    Type of Pool: In ground
    Pool Material: Concrete
    Remodel to Include: Resurface pool
    Remodel to Include: New tile / coping
    Remodel to Include: New pool deck
    What kind of location is this?: Home/Residence
    Desired Completion Date: Timing is flexible
    Request Stage: Planning & Budgeting
    Comment: Looking into remodeling the deck, coping, and resurfacing our pool, and possibly adding a water feature.
  • Project Location: Denver CO
    Date: 04/2014
    Type of Pool: In ground
    Pool Material: Fiberglass
    What kind of location is this?: Home/Residence
    Desired Completion Date: More than 2 weeks
    Request Stage: Planning & Budgeting
    Property Owner: Yes
  • Project Location: Parker CO
    Date: 04/2014
    Pool Material: Concrete
    Remodel to Include: New tile / coping
    What kind of location is this?: Home/Residence
    Desired Completion Date: Within 1 week
    Request Stage: Ready to Hire
    Property Owner: Yes
    Comment: 110 linear feet. 2 rows of 3 in vertical tiles to be removed. 19' of 2 rows of 3" tiles horizontal at pool cover end to be removed. . all new tiles installesd.