Shelter or Outbuilding

Submit and Get Matched to Pre-screened Outbuilding or Shelter Contractors

Construct a Shelter or Below Ground Outbuilding in Indiana

ZIP/Postal Code (Location of Request): *
How many people will the shelter protect?
Of what material would you like the shelter made?
Where will the shelter be installed?
What features do you want in your shelter?
Step   Step 1 Step 2 Step 3   -  Describe Your Construct a Shelter or Below Ground Outbuilding Need in Indiana

Top Outbuilding or Shelter Contractors in Indiana

Recent Job Leads for Indiana Outbuilding or Shelter Contractors

  • Project Location: Danville IN
    Date: 04/2015
    Number of People to use Shelter: 4-6 people
    What kind of location is this?: Home/Residence
    Desired Completion Date: More than 2 months
    Request Stage: Planning & Budgeting
    Comment: I live in a duplex and my biggest fear is storms. I have a 1 yr old and I would like to feel safe.
  • Project Location: Churubusco IN
    Date: 04/2015
    Number of People to use Shelter: Other
    Installation Location: Underground in yard
    Features: Chemical toilet
    Features: Wired for electricity, phone lines
    What kind of location is this?: Home/Residence
    Desired Completion Date: More than 2 months
    Request Stage: Planning & Budgeting
    Property Owner: Yes
    Comment: My Mother is considering downsizing and moving from her existing farm house with basement to a smaller home built on a crawl space rather than a basement. We are interested in getting pricing for construction of a storm shelter for no more than 4 people. Ideally, Mom would be able to access the storm shelter without having to go to far from the house in bad weather.
  • Project Location: Brazil IN
    Date: 01/2015
    What kind of location is this?: Home/Residence
    Desired Completion Date: Timing is flexible
    Request Stage: Ready to Hire
    Property Owner: Yes
    Comment: 30x20 cabin in lake van bibber basic amenities , living room, bedroom, bathroom kitchenette remove structure that is there now
  • Project Location: Oolitic IN
    Date: 05/19/2014
    Number of People to use Shelter: 4-6 people
    Shelter Material: Steel
    Installation Location: Other
    Features: Other
    What kind of location is this?: Home/Residence
    Desired Completion Date: Less than 2 months
    Request Stage: Planning & Budgeting
    Property Owner: Yes
    Comment: we want to found out to get some steriods form to pour concreate in them.
  • Project Location: Westfield IN
    Date: 04/2014
    Number of People to use Shelter: 4-6 people
    Installation Location: Dug out under existing home
    Features: Other
    What kind of location is this?: Home/Residence
    Desired Completion Date: Less than 2 months
    Request Stage: Planning & Budgeting
    Property Owner: Yes