Submit and Get Matched to Pre-screened Bathroom Remodelers
Remodel a Bathroom in Michigan
Top Bathroom Remodelers in Michigan
-
Phone: (734) 352-3290
46315 Ryan Road, Shelby Township MI 48317
-
Phone: (866) 738-7128
26943 West 8 Mile Road, Redford MI 48240
-
Phone: (734) 991-9326
3484 Oak Knoll, Brighton MI 48114
-
Phone: (313) 230-9338
6336 Marcy, Brighton MI 48116
-
Phone: (313) 230-9585
37047 Chickadee Lane, Farmington Hills MI 48335
Recent Job Leads for Michigan Bathroom Remodelers
-
Project Location: Alanson MI
Date: 05/22/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Desired Completion Date: Less than 2 months
Request Stage: Ready to Hire
Comment: This mobile user did not provide any additional comments.
Project Location: Utica MI
Date: 05/21/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Desired Completion Date: Less than 2 months
Request Stage: Planning & Budgeting
Project Location: Troy MI
Date: 05/21/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Desired Completion Date: Less than 2 months
Request Stage: Planning & Budgeting
Requires Work on Historical Structure: No
Comment: Complete bathroom remodel. Removing tub and installing shower for elderly. Need built in bench, wall railing and pull down shower head. Also shelf or wall insert for shampoo. New toilet, new cabinet, sink, floor, ect.
Project Location: Utica MI
Date: 05/21/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Desired Completion Date: Less than 2 months
Request Stage: Ready to Hire
Requires Work on Historical Structure: No
Comment: I have a water leak behind the tub and sink faucet areas in my main bathroom. Because there is no access to the plumbing, the tile in the bathroom must be removed in order for the plumbing to be corrected. I have contacted my homeowners insurance carrier and they have approved for the bathroom to be remodeled which will include tile work, plumbing, replacment of the tub and shower faucets and head and most probable drywall as well. I'm looking for a contractor who can work with my insurance company (Citizens) and get the job done timely and professionally.
Project Location: Brighton MI
Date: 05/21/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Desired Completion Date: Less than 2 months
Request Stage: Planning & Budgeting
Requires Work on Historical Structure: No
Comment: Not a huge bathroom but still wish to remove tub and replace with updated shower and any related plumbing. Maintain existing sink but look to add a second one plus new toilet. New tile on floor and tile the shower desired.