Bathroom Remodel

Submit and Get Matched to Pre-screened Bathroom Remodelers

Remodel a Bathroom in Michigan

ZIP/Postal Code (Location of Request): *
How extensively do you want to remodel your bathroom? *
What changes will be included in this remodel?
Shower / Bath *
Toilet *
Cabinets / Vanity *
Countertops *
Sinks *
Flooring *
Step   Step 1 Step 2 Step 3   -  Describe Your Remodel a Bathroom Need in Michigan

Top Bathroom Remodelers in Michigan

Recent Job Leads for Michigan Bathroom Remodelers

  • new lead
    Project Location: Alanson MI
    Date: 05/22/2013
    Shower / Bath: Yes - I want to move or install a new shower or bath
    Toilet: Yes - I will be replacing or moving the toilet
    Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
    Countertops: Yes - I plan to update the countertops
    Sinks: Yes - I plan to update the sinks
    Flooring: Yes - I plan to update the flooring
    Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
    Desired Completion Date: Less than 2 months
    Request Stage: Ready to Hire
    Comment: This mobile user did not provide any additional comments.
  • new lead
    Project Location: Utica MI
    Date: 05/21/2013
    Shower / Bath: Yes - I want to move or install a new shower or bath
    Toilet: Yes - I will be replacing or moving the toilet
    Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
    Countertops: No - I do not plan to update the countertops
    Sinks: No - I do not plan to update the sinks
    Flooring: Yes - I plan to update the flooring
    Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
    Desired Completion Date: Less than 2 months
    Request Stage: Planning & Budgeting
  • new lead
    Project Location: Troy MI
    Date: 05/21/2013
    Shower / Bath: Yes - I want to move or install a new shower or bath
    Toilet: Yes - I will be replacing or moving the toilet
    Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
    Countertops: Yes - I plan to update the countertops
    Sinks: Yes - I plan to update the sinks
    Flooring: Yes - I plan to update the flooring
    Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
    Desired Completion Date: Less than 2 months
    Request Stage: Planning & Budgeting
    Requires Work on Historical Structure: No
    Comment: Complete bathroom remodel. Removing tub and installing shower for elderly. Need built in bench, wall railing and pull down shower head. Also shelf or wall insert for shampoo. New toilet, new cabinet, sink, floor, ect.
  • new lead
    Project Location: Utica MI
    Date: 05/21/2013
    Shower / Bath: Yes - I want to move or install a new shower or bath
    Toilet: Yes - I will be replacing or moving the toilet
    Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
    Countertops: No - I do not plan to update the countertops
    Sinks: No - I do not plan to update the sinks
    Flooring: Yes - I plan to update the flooring
    Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
    Desired Completion Date: Less than 2 months
    Request Stage: Ready to Hire
    Requires Work on Historical Structure: No
    Comment: I have a water leak behind the tub and sink faucet areas in my main bathroom. Because there is no access to the plumbing, the tile in the bathroom must be removed in order for the plumbing to be corrected. I have contacted my homeowners insurance carrier and they have approved for the bathroom to be remodeled which will include tile work, plumbing, replacment of the tub and shower faucets and head and most probable drywall as well. I'm looking for a contractor who can work with my insurance company (Citizens) and get the job done timely and professionally.
  • new lead
    Project Location: Brighton MI
    Date: 05/21/2013
    Shower / Bath: Yes - I want to move or install a new shower or bath
    Toilet: Yes - I will be replacing or moving the toilet
    Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
    Countertops: Yes - I plan to update the countertops
    Sinks: Yes - I plan to update the sinks
    Flooring: Yes - I plan to update the flooring
    Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
    Desired Completion Date: Less than 2 months
    Request Stage: Planning & Budgeting
    Requires Work on Historical Structure: No
    Comment: Not a huge bathroom but still wish to remove tub and replace with updated shower and any related plumbing. Maintain existing sink but look to add a second one plus new toilet. New tile on floor and tile the shower desired.