Sod

Submit and Get Matched to Pre-screened Sod Installation Contractors

Install Sod in Michigan

ZIP/Postal Code (Location of Request): *
What kind of location is this? *
What is the estimated size of the area needing sod?
Does the area need to be graded before top soil and sod is placed?
What existing surfaces have to be removed before the sod is installed?
Step   Step 1 Step 2 Step 3   -  Describe Your Install Sod Need in Michigan

Top Sod Installation Contractors in Michigan

Recent Job Leads for Michigan Sod Installation Contractors

  • new lead
    Project Location: Warren MI
    Date: 10/2014
    Comment: Customer is needing to have a estimate on wants to have the lawn to be repaired
  • new lead
    Project Location: Belleville MI
    Date: 10/2014
    Grading required: Yes
    Old surface removal: No existing surfaces to be removed
    Size of area needing sod: Small (Less than 1,000 sq ft)
    What kind of location is this?: Home/Residence
    Desired Completion Date: 1 - 2 weeks
    Request Stage: Ready to Hire
    Property Owner: Yes
  • new lead
    Project Location: Saint Joseph MI
    Date: 10/2014
    Grading required: Don't Know
    Old surface removal: No existing surfaces to be removed
    Size of area needing sod: Small (Less than 1,000 sq ft)
    What kind of location is this?: Home/Residence
    Desired Completion Date: Within 1 week
    Request Stage: Ready to Hire
    Property Owner: Yes
  • new lead
    Project Location: Marshall MI
    Date: 10/2014
    Grading required: Don't Know
    Old surface removal: Old grass or weeds
    Size of area needing sod: Small (Less than 1,000 sq ft)
    What kind of location is this?: Home/Residence
    Desired Completion Date: Timing is flexible
    Request Stage: Planning & Budgeting
    Property Owner: Yes
    Comment: had some pine trees removed now need grass
  • new lead
    Project Location: Lowell MI
    Date: 10/2014
    Grading required: No
    Size of area needing sod: Very Large (More than 10,000 sq ft)
    Desired Completion Date: More than 2 weeks
    Request Stage: Planning & Budgeting