Submit and Get Matched to Pre-screened Bathroom Remodelers
Remodel a Bathroom in Nevada
Top Bathroom Remodelers in Nevada
-
Phone: (702) 852-1015
7260 West Azure Drive, Suite 140-58, Las Vegas NV 89130
-
Phone: (702) 824-9936
5575 Annie Oakley Dr., Las Vegas NV 89120
-
Phone: (702) 824-9437
6490 South McCarran Boulevard, Suite D1-35, Reno NV 89509
-
Phone: (702) 824-9409
2565 Garzoni Drive, Sparks NV 89434
-
Phone: (866) 455-3734
395 Freeport Boulevard, Sparks NV 89431
Recent Job Leads for Nevada Bathroom Remodelers
-
Project Location: Henderson NV
Date: 05/21/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Requires Work on Historical Structure: No
Comment: Looking to update my bathroom w minor changes ( if possible) to closet in bathroom. New shower, toilet and sink.
Project Location: Wellington NV
Date: 05/21/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Desired Completion Date: Less than 2 months
Request Stage: Planning & Budgeting
Requires Work on Historical Structure: No
Comment: i have a older mobile home, with water damge in the flooring. I would like the sub floor replaced, the shower tub taken out and a new one put in. I would like to update the toilet. also want the exsisting cabniets and sink taken out and new ones put in, a more modern look, along with building some cupboards in a cornor for storage.
Project Location: Las Vegas NV
Date: 05/21/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Requires Work on Historical Structure: No
Project Location: Las Vegas NV
Date: 05/20/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Requires Work on Historical Structure: No
Comment: Condo bathroom remodel to replace sink, cabinet, take large tub out and replace with a soaking bathtub and a shower. Add some shelfing. My daughter lives in the condo that was built in 1992 and needs updating and refreshing. Also want to add tile to the bathroom and bedroom that is ajoining the bathroom.
Project Location: Las Vegas NV
Date: 05/20/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Desired Completion Date: More than 2 months
Request Stage: Planning & Budgeting
Requires Work on Historical Structure: No