Bathroom Remodel

Submit and Get Matched to Pre-screened Bathtub Specialists

Install or Replace a Bathtub in New York

ZIP/Postal Code (Location of Request): *
What type of bathtub do you want installed?
What changes will be included with this bathtub install?
Bathtub
Plumbing fixtures (faucets, drains, etc)
Tile
Is this project part of a larger remodel?
Step   Step 1 Step 2 Step 3   -  Describe Your Install or Replace a Bathtub Need in New York

Top Bathtub Specialists in New York

Recent Job Leads for New York Bathtub Specialists

  • new lead
    Project Location: Jackson Heights NY
    Date: 07/23/2014
    Type of tub install: Shower / tub combo
    Bathtub: Replace or move existing bathtub
    Plumbing fixtures: Yes - I plan to install new plumbing fixtures
    Tile: Yes - I plan to install new tile
    Historical Work: Yes
    Desired Completion Date: Timing is flexible
    Request Stage: Ready to Hire
    Part of larger remodel: Yes
    Property Owner: Yes
    Comment: A bathroom and a separate shower room to completely redo, including enlarger the shore room. Electric work and sSome carpentry needed throughout the apartment.
  • new lead
    Project Location: Freeport NY
    Date: 07/23/2014
    Bathtub: Install a new bathtub (No existing bathtub)
    Plumbing fixtures: Yes - I plan to install new plumbing fixtures
    Tile: No - I do not plan to install new tile
    Desired Completion Date: More than 2 weeks
    Request Stage: Ready to Hire
  • new lead
    Project Location: Scarsdale NY
    Date: 07/23/2014
    Type of tub install: Soaking
    Bathtub: Replace or move existing bathtub
    Plumbing fixtures: No - I do not plan to install new plumbing fixtures
    Tile: Yes - I plan to install new tile
    Historical Work: No
    Desired Completion Date: Timing is flexible
    Request Stage: Ready to Hire
    Part of larger remodel: Yes
    Property Owner: Yes
  • new lead
    Project Location: Levittown NY
    Date: 07/23/2014
    Type of tub install: Shower / tub combo
    Bathtub: Replace or move existing bathtub
    Tile: No - I do not plan to install new tile
    Historical Work: Yes
    Desired Completion Date: Timing is flexible
    Request Stage: Ready to Hire
    Property Owner: Yes
    Comment: change old bathtub and hot and cold waterline faucet
  • new lead
    Project Location: Jamestown NY
    Date: 07/23/2014
    What kind of location is this?: Home/Residence
    Desired Completion Date: More than 2 weeks
    Request Stage: Ready to Hire