Bathroom Remodel

Submit and Get Matched to Pre-screened Bathtub Specialists

Install or Replace a Bathtub in New York

ZIP/Postal Code (Location of Request): *
What type of bathtub do you want installed?
What changes will be included with this bathtub install?
Bathtub
Plumbing fixtures (faucets, drains, etc)
Tile
Is this project part of a larger remodel?
Step   Step 1 Step 2 Step 3   -  Describe Your Install or Replace a Bathtub Need in New York

Top Bathtub Specialists in New York

Recent Job Leads for New York Bathtub Specialists

  • new lead
    Project Location: New York NY
    Date: 04/20/2014
    Type of tub install: Shower / tub combo
    Bathtub: Replace or move existing bathtub
    Plumbing fixtures: Yes - I plan to install new plumbing fixtures
    Tile: Yes - I plan to install new tile
    Historical Work: No
    Desired Completion Date: 1 - 2 weeks
    Request Stage: Ready to Hire
    Part of larger remodel: No
    Property Owner: Yes
    Comment: change all bathroom fixtures retile and install a pocket door remove and close original doorway
  • new lead
    Project Location: Bronx NY
    Date: 04/20/2014
    Shower / Bath: Yes - I want to move or install a new shower or bath
    Toilet: No - I will keep the existing toilet as is
    Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
    Countertops: No - I do not plan to update the countertops
    Sinks: No - I do not plan to update the sinks
    Flooring: No - I do not plan to update the flooring
    Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
    Are you updating a shower or a bathtub?: Both
    Desired Completion Date: Less than 2 months
    Request Stage: Ready to Hire
    Comment: The bathroom tile in shower and the walls need to come down a venting system need to be put in the light fixture window need to be replace cabinet and lighting need to replace
  • new lead
    Project Location: Bellmore NY
    Date: 04/17/2014
    Type of tub install: Shower / tub combo
    Bathtub: Install a new bathtub (No existing bathtub)
    Plumbing fixtures: No - I do not plan to install new plumbing fixtures
    Tile: Yes - I plan to install new tile
    Historical Work: No
    Desired Completion Date: 1 - 2 weeks
    Request Stage: Planning & Budgeting
    Part of larger remodel: No
    Property Owner: Yes
    Comment: bathroom is already gutted. Need 1 wall to be framed , sheetrock , new subfloor to be installed , tile bathroom floor and walls. electric and plumbing already being taken care of
  • new lead
    Project Location: New Rochelle NY
    Date: 04/17/2014
    Type of tub install: Shower / tub combo
    Bathtub: Replace or move existing bathtub
    Plumbing fixtures: No - I do not plan to install new plumbing fixtures
    Tile: Yes - I plan to install new tile
    Historical Work: No
    Desired Completion Date: Timing is flexible
    Request Stage: Planning & Budgeting
    Part of larger remodel: No
    Property Owner: Yes
    Comment: 3rd foor bath. has claw foot tub in wrong place. would like advice if it could be moved. may have to stick with original footprint. need new floor tile and small wall mounted sink.
  • new lead
    Project Location: Poughkeepsie NY
    Date: 04/17/2014
    Desired Completion Date: Within 1 week
    Request Stage: Ready to Hire
    Comment: I have a smaller size tub in my bathroom and looking to replace it with the regular size tub