Submit and Get Matched to Pre-screened Elevator or Chairlift Contractors


Repair an Elevator or Chair Lift in Wisconsin

ZIP/Postal Code (Location of Request): *
What kind of elevator or chair lift needs repair?
What best describes the problem?
What is the location of the lift?

Top Elevator or Chairlift Contractors in Wisconsin

Recent Job Leads for Wisconsin Elevator or Chairlift Contractors

  • Project Location: De Pere WI
    Date: 08/2015
    Location of Lift: Indoors
    Describe Problem: Other
    Kind of Lift: Commercial elevator
    What kind of location is this?: Business
    Covered by Insurance: No
    Financing Requested: No
    Desired Completion Date: Timing is flexible
    Request Stage: Planning & Budgeting
    Property Owner: Yes
  • Project Location: Madison WI
    Date: 08/2015
    What kind of location is this?: Home/Residence
    Covered by Insurance: No
    Financing Requested: No
    Desired Completion Date: Timing is flexible
    Request Stage: Ready to Hire
    Property Owner: Yes
    Comment: Repair lift chair
  • Project Location: Egg Harbor WI
    Date: 08/2015
    Location of Lift: Indoors
    Describe Problem: Lift stuck in position mid floor
    Kind of Lift: Home elevator with enclosed cab
    What kind of location is this?: Home/Residence
    Covered by Insurance: No
    Financing Requested: No
    Desired Completion Date: Within 1 week
    Request Stage: Ready to Hire
    Property Owner: Yes
    Comment: Elevator not working in home. After power failure.
  • Project Location: Milwaukee WI
    Date: 07/2015
    Describe Problem: Other
    Kind of Lift: Vertical platform or wheelchair lift
    What kind of location is this?: Home/Residence
    Financing Requested: No
    Desired Completion Date: 1 - 2 weeks
    Request Stage: Ready to Hire
    Comment: My wheelchair porch lift is rusting
  • Project Location: Wausau WI
    Date: 07/2015
    Describe Problem: Makes odd noise while in operation
    Kind of Lift: Portable wheelchair lift
    What kind of location is this?: Home/Residence
    Financing Requested: Yes
    Desired Completion Date: Within 1 week
    Request Stage: Ready to Hire
    Comment: Mini van lift made grinding noises, now comes down , in, out fine. But up is so slow it is closer to stop. Takes forever to come up. Afraid it will stop soon.