Recent Job Requests for Install or Replace a Shower Contractors in Boston, Massachusetts:
Project Location:
Boston,
MA
02109
Date: 03/2013
Type of shower install: Free-standing shower
Shower: Replace or move existing shower
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
What kind of location is this?: Home/Residence
Historical Work: No
Desired Completion Date: Within 1 week
Request Stage: Ready to Hire
Property Owner: Yes
Comment: I need shower replacement including new plumbing and tile
Project Location:
Boston,
MA
02118
Date: 02/2013
Type of shower install: Free-standing shower
Shower: Replace or move existing shower
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
What kind of location is this?: Home/Residence
Historical Work: No
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Part of larger remodel: No
Property Owner: Yes
Project Location:
Boston,
MA
02128
Date: 08/2012
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Interested in Green Alternatives: No
Are you updating a shower or a bathtub?: Shower
Desired Completion Date: Timing is flexible
Comment: I want a one piece shower to replace the existing glass shower room
Project Location:
Boston,
MA
02118
Date: 08/2012
Shower: Replace or move existing shower
Tile: Yes - I plan to install new tile
Historical Work: No
Desired Completion Date: 1 - 2 weeks
Request Stage: Ready to Hire
Part of larger remodel: No
Property Owner: Yes
Comment: I have a leaking tiled shower floor; that I suspect never had a rubber membrane installed underneath it.
Project Location:
Boston,
MA
02127
Date: 05/16/2012
Type of shower install: Free-standing shower
Shower: Replace or move existing shower
Plumbing fixtures: No - I do not plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Historical Work: No
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Part of larger remodel: No
Property Owner: Yes
Comment: Replace plastic shower base with tiles. Fix/replace shower door. Replace vanity and mirror.
Project Location:
Boston,
MA
02127
Date: 05/05/2012
Type of shower install: Free-standing shower
Shower: Replace or move existing shower
Plumbing fixtures: No - I do not plan to install new plumbing fixtures
Tile: No - I do not plan to install new tile
Historical Work: No
Desired Completion Date: 1 - 2 weeks
Request Stage: Planning & Budgeting
Part of larger remodel: No
Property Owner: Yes
Comment: The water pressure is directly connected to the temp, which has lead to a very cold soft shower or an extremely hot powerful shower
Project Location:
Boston,
MA
02111
Date: 04/2012
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Interested in Green Alternatives: No
Are you updating a shower or a bathtub?: Shower
Desired Completion Date: Less than 2 months
Comment: I need a 36x48in shower enclosure (http://www.faucetdirect.com/vigo-vg605148-36-x-48-frameless-3-8-clear-or-frosted-glass-shower-enclosure/p1350617?intcmp=recs_prodVG605148_productPageWRatings3Items_placement1) to be installed in my bathroom.
Project Location:
Boston,
MA
02118
Date: 04/2012
Type of shower install: Free-standing shower
Shower: Replace or move existing shower
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Historical Work: No
Desired Completion Date: Timing is flexible
Request Stage: Ready to Hire
Part of larger remodel: No
Property Owner: Yes
Comment: Existing shower needs to be re-built.
Project Location:
Boston,
MA
02124
Date: 03/2012
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Are you updating a shower or a bathtub?: Shower
Desired Completion Date: Less than 2 months
Request Stage: Ready to Hire
Project Location:
Boston,
MA
02124
Date: 03/2012
Type of shower install: Free-standing shower
Shower: Replace or move existing shower
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Historical Work: No
Desired Completion Date: 1 - 2 weeks
Request Stage: Planning & Budgeting
Part of larger remodel: No
Property Owner: Yes
Comment: We have an existing walkin shower that we want to expand and add multiple shower heads and jets. We would like to tile the shower. Note: a radiator will need to be removed and capped.
Project Location:
Boston,
MA
02125
Date: 02/2012
Type of shower install: Free-standing shower
Shower: Replace or move existing shower
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Historical Work: No
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Part of larger remodel: No
Property Owner: Yes
Comment: Looking to remove the tub and install a free standing shower with a glass doors.
Project Location:
Boston,
MA
02125
Date: 01/2012
Type of shower install: Free-standing shower
Shower: Replace or move existing shower
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Historical Work: No
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Part of larger remodel: No
Property Owner: Yes
Comment: I have a tub/shower combo, want to remove the tub and replace with just a shower, to include the shower floor, surround, door and new fixtures.
Project Location:
Boston,
MA
02119
Date: 11/2011
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Historical Work: No
Desired Completion Date: Within 1 week
Request Stage: Ready to Hire
Part of larger remodel: Yes
Property Owner: Yes
Comment: had shower put in now --need shower door place an check for leaks also put in counterwith sink