Recent Job Requests for Install or Replace a Shower Contractors in Chesapeake, Virginia:
Project Location:
Chesapeake,
VA
23322
Date: 05/19/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Are you updating a shower or a bathtub?: Shower
Desired Completion Date: Less than 2 months
Request Stage: Planning & Budgeting
Comment: The existing shower had water damaged under it. The pan had damage and leaked. The subflooring has been replaced but not the pan. Tile has been removed. Need flooring repaired and tiling. Shower stall is 4'3" x 2'4" x 6'9"
Project Location:
Chesapeake,
VA
23320
Date: 03/2013
Type of shower install: Free-standing shower
Shower: Replace or move existing shower
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
What kind of location is this?: Home/Residence
Historical Work: No
Desired Completion Date: Timing is flexible
Request Stage: Ready to Hire
Part of larger remodel: No
Property Owner: Yes
Comment: replace existing pre-fab shower stall, shower door and plumbing fixtures with ceramic tile shower
Project Location:
Chesapeake,
VA
23322
Date: 08/2012
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Are you updating a shower or a bathtub?: Shower
Desired Completion Date: Timing is flexible
Request Stage: Ready to Hire
Comment: need new shower in master bedroom replaced
Project Location:
Chesapeake,
VA
23323
Date: 08/2012
Type of shower install: Free-standing shower
Shower: Replace or move existing shower
Plumbing fixtures: No - I do not plan to install new plumbing fixtures
Tile: No - I do not plan to install new tile
Historical Work: No
Desired Completion Date: More than 2 weeks
Request Stage: Planning & Budgeting
Part of larger remodel: No
Property Owner: Yes
Comment: The floor in my shower crack, I need to rebuild the structure underneath and replace or restore floor of shower unit,
Project Location:
Chesapeake,
VA
23323
Date: 08/2012
Type of shower install: Free-standing shower
Shower: Replace or move existing shower
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: No - I do not plan to install new tile
Historical Work: No
Desired Completion Date: Timing is flexible
Request Stage: Ready to Hire
Part of larger remodel: No
Property Owner: Yes
Comment: want to replace an existing fiberglass stand alone shower
Project Location:
Chesapeake,
VA
23322
Date: 08/2012
Type of shower install: Free-standing shower
Shower: Replace or move existing shower
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: No - I do not plan to install new tile
Historical Work: No
Desired Completion Date: Timing is flexible
Request Stage: Ready to Hire
Part of larger remodel: No
Property Owner: Yes
Comment: we have an exsiting shower that is very torn up and disgusting.
Project Location:
Chesapeake,
VA
23322
Date: 07/2012
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Interested in Green Alternatives: Yes
Are you updating a shower or a bathtub?: Shower
Desired Completion Date: Timing is flexible
Comment: lookinh to create a more modern shower
Project Location:
Chesapeake,
VA
23320
Date: 07/2012
Type of shower install: Free-standing shower
Shower: Replace or move existing shower
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Historical Work: No
Desired Completion Date: 1 - 2 weeks
Request Stage: Ready to Hire
Part of larger remodel: Yes
Property Owner: Yes
Project Location:
Chesapeake,
VA
23324
Date: 06/2012
Type of shower install: Free-standing shower
Shower: Replace or move existing shower
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Historical Work: No
Desired Completion Date: More than 2 weeks
Request Stage: Planning & Budgeting
Part of larger remodel: No
Property Owner: Yes
Comment: I have a free-standing shower that currently has a tub liner system and I would like to remove it and tile it completely.
Project Location:
Chesapeake,
VA
23320
Date: 05/10/2012
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Interested in Green Alternatives: No
Are you updating a shower or a bathtub?: Shower
Desired Completion Date: Less than 2 months
Comment: Remove and replace tile in master bath shower and install vent fan.
Project Location:
Chesapeake,
VA
23320
Date: 04/2012
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Interested in Green Alternatives: No
Are you updating a shower or a bathtub?: Shower
Desired Completion Date: Less than 2 months
Comment: shower remodel,replace ceramic with tile