Recent Job Requests for Install or Replace a Bathtub Contractors in San Francisco, California:
Project Location:
San Francisco,
CA
94114
Date: 06/04/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Comment: Replace tub, add 2nd shower, retile.
Project Location:
San Francisco,
CA
94114
Date: 06/01/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Are you updating a shower or a bathtub?: Bathtub
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Comment: Replace tub, add 2nd shower, retile.
Project Location:
San Francisco,
CA
94124
Date: 05/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Are you updating a shower or a bathtub?: Bathtub
Desired Completion Date: Less than 2 months
Request Stage: Planning & Budgeting
Project Location:
San Francisco,
CA
94112
Date: 05/2013
Type of tub install: Shower / tub combo
Bathtub: Replace or move existing bathtub
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Historical Work: No
Desired Completion Date: 1 - 2 weeks
Request Stage: Ready to Hire
Part of larger remodel: Yes
Property Owner: Yes
Comment: need to replace the tub, toilet and sink and floor
Project Location:
San Francisco,
CA
94110
Date: 04/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Are you updating a shower or a bathtub?: Bathtub
Desired Completion Date: Less than 2 months
Request Stage: Ready to Hire
Comment: remodel of small batroom 35 sq ft - check on the existing ventilation system (may need to get a better fan) - repaint molded ceiling - redo wall tiles - change bath tub
Project Location:
San Francisco,
CA
94116
Date: 04/2013
Historical Work: No
Desired Completion Date: 1 - 2 weeks
Request Stage: Ready to Hire
Property Owner: Yes
Project Location:
San Francisco,
CA
94102
Date: 03/2013
Type of tub install: Whirlpool / jetted tub
Bathtub: Replace or move existing bathtub
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Historical Work: Yes
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Part of larger remodel: No
Property Owner: Yes
Project Location:
San Francisco,
CA
94121
Date: 03/2013
Type of tub install: Shower / tub combo
Bathtub: Replace or move existing bathtub
Tile: Yes - I plan to install new tile
Historical Work: No
Desired Completion Date: 1 - 2 weeks
Request Stage: Ready to Hire
Part of larger remodel: Yes
Property Owner: Yes
Project Location:
San Francisco,
CA
94114
Date: 03/2013
Type of tub install: Shower / tub combo
Bathtub: Replace or move existing bathtub
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Historical Work: No
Desired Completion Date: Within 1 week
Request Stage: Ready to Hire
Part of larger remodel: Yes
Property Owner: Yes
Comment: I'm remodeling a bathroom (split bath - no toilet in this room). The is roughly 100"x50"... and I want to replace an existing tub.
Project Location:
San Francisco,
CA
94114
Date: 03/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Are you updating a shower or a bathtub?: Both
Desired Completion Date: Less than 2 months
Request Stage: Planning & Budgeting
Comment: Installing whirlpool tub and maintains the shower.
Project Location:
San Francisco,
CA
94122
Date: 01/2013
Type of tub install: Shower / tub combo
Bathtub: Replace or move existing bathtub
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Historical Work: No
Desired Completion Date: More than 2 weeks
Request Stage: Ready to Hire
Part of larger remodel: Yes
Property Owner: Yes
Comment: I have an old claw foot tub I need moved to the back yard and am purchasing a new cast iron tub to be installed. The new tub weighs 275 lbs. I live on the top floor of a duplex - 2 sets of stairs. I would like the new tub to be picked up at the store or I can have the store deliver to the sidewalk. I would also like the new tub leveled.
Project Location:
San Francisco,
CA
94116
Date: 01/2013
What kind of location is this?: Home/Residence
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting