Are You a Quality Pro? Join Our Network
Get leads like these

Recent Job Requests for Plumbers in Washington, Washington DC:


New Lead
Project: Install or Replace a Shower
Location: Washington, DC
Date: 03/27/2015
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Are you updating a shower or a bathtub?: Shower
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Comment: Shower title need replacement

New Lead
Project: Install, Repair or Replace Plumbing or Fixtures
Location: Washington, DC
Date: 03/23/2015
Plumbing Fixtures: Water pressure valve
What kind of location is this?: Home/Residence
Type of Business: Service
Comment: Need access to water valve.

New Lead
Project: Install or Replace a Bathtub
Location: Washington, DC
Date: 03/22/2015
Type of tub install: Shower / tub combo
Bathtub: Replace or move existing bathtub
Desired Completion Date: More than 2 weeks
Request Stage: Planning & Budgeting
Comment: Move bathroom from one area to another. Use same materials .

Project: Install or Replace a Bathtub
Location: Washington, DC
Date: 03/14/2015
Type of tub install: Shower / tub combo
Bathtub: Install a new bathtub (No existing bathtub)
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Historical Work: No
Desired Completion Date: Within 1 week
Request Stage: Ready to Hire
Part of larger remodel: Yes
Property Owner: Yes

Project: Install or Replace a Bathtub
Location: Washington, DC
Date: 03/10/2015
Type of tub install: Shower / tub combo
Bathtub: Install a new bathtub (No existing bathtub)
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Historical Work: No
Desired Completion Date: Within 1 week
Request Stage: Planning & Budgeting
Part of larger remodel: No
Property Owner: Yes
Comment: Converting Closet in Bedroom to a small bathroom. This will be right next to the existing full bath and washer/dryer. Will include Shower, toilet and vanity