Compare Quotes from up to 3 Pros

Addition & Remodeling Contractors in San Francisco, CA

Where do you need Addition & Remodeling Contractors?


Deals Tag = Deals
Compare quotes with a single request

Let our ProFinder technology instantly match you to the perfect pros for your project.

Find the Right Pro. Right Away.

Let our ProFinder technology instantly match you to the perfect pros for your project.

Showing 26-50 of 91
< Prev | 1 | 2 | 3 | 4 | Next >

Recent Job Requests for Additions & Remodeling Contractors in San Francisco, CA


New Lead
Project: Build an Addition
Location: San Francisco, CA
Date: 05/23/2019
Project Description: Design and build
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Comment: gutter need to be changed Widow damage possible inside room leak-smell moldy

New Lead
Project: Remodel a Kitchen
Location: San Francisco, CA
Date: 05/23/2019
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: No - I do not plan to move or update the cabinets
Appliances: No - I do not plan to move or update the appliances
Countertops: Yes - I plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Lighting: No - I do not plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence

New Lead
Project: Remodel a Bathroom
Location: San Francisco, CA
Date: 05/23/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: Yes
Covered by Insurance: No
Request for Commercial Location: No
Comment: Our initial thoughts are to keep the layout of the bathroom the same because of the plumbing, but go with a like to like approach with no relocation. High level we are thinking of: 1- installing a larger bathtub 2- replacing the tile (floor and bath tub area) 3- installing a smaller vanity 4- installing a larger toilet 5- possibly adding one more power outlet 6- replacing the exhaust fan 7- explore replacing the water heater with a tankless

New Lead
Project: Remodel a Bathroom
Location: San Francisco, CA
Date: 05/23/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: I want to remove all flooring (tile covered by linoleum) and possibly replace subfloor, install tile, new vanity, new toilet, new show doors, shower fixtures. mirrored medicine cabinet, and some simple hardware. no need to break open walls

New Lead
Project: Remodel a Bathroom
Location: San Francisco, CA
Date: 05/23/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible

New Lead
Project: Renovate or Repair a Home
Location: San Francisco, CA
Date: 05/23/2019
Project Type: Exterior
Work included: Other
Comment: Front exterior stairway

New Lead
Project: Remodel a Kitchen
Location: San Francisco, CA
Date: 05/23/2019
Floorplan: I am considering changes to kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes
Comment: I would like to get an estimate for remodeling a kitchen.

New Lead
Project: Remodel a Kitchen
Location: San Francisco, CA
Date: 05/23/2019
Floorplan: I am considering changes to kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: Yes
Covered by Insurance: No
Property Owner: Yes

New Lead
Project: Build an Addition
Location: San Francisco, CA
Date: 05/22/2019
Project Description: Design and build
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Comment: Looking for general contractor , to install a 96inch by 76inch window and frame in the front house on outside stair rails , should take two to three hours to install , willing to pay $700 to $800..

New Lead
Project: Remodel a Kitchen
Location: San Francisco, CA
Date: 05/22/2019
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Comment: We are looking to remove tile floor in 300 square foot kitchen and refinish Douglas for subfloor, move the oven over 8 feet, update cabinets and replace two windows. We have a good idea of the layout we want and are now in the planning/research phase