Crowley Construction, Inc.

4714 Williams Creek, College Station, TX 77845
(979) 777-0285
Is this your business?
Claim Your Listing
!

Please Note: This business is not a current member of the HomeAdvisor network.  Learn about our screening process

Business Information


QUICK FACTS

Business Hours

12:00 am - 12:00 am (Please call to confirm)

  • Free Estimates
  • Credit Cards Accepted
  • Bilingual

SERVICES OFFERED

Additions & Remodeling

SERVICE AREA

College Station

Get Quotes
From up to 3 Prescreened
Additions & Remodeling Pros


 1 Enter ZIP Code

 2 Describe Project

 3 Get Quotes

Service Professional? Join HomeAdvisor to Get Leads Like These

Recent Job Requests for Addition & Remodeling Contractors in College Station, TX:


Project: Remodel a Kitchen
Date: 07/17/2019
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: No - I do not plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: No - I do not plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
What kind of location is this?: Home/Residence

Project: Remodel a Garage
Date: 07/15/2019
Scope of Remodel: Completely remodel garage
Storage cabinets / shelving: No - I do not plan to add or update the cabinets / shelving
Garage doors: Yes - I plan to update the garage doors
Insulation: No - I do not plan to add insulation
Flooring: No - I do not plan to update the flooring
Electrical: Yes - I plan to update the lighting or electrical fixtures
Interior walls or drywall: No - I do not plan to add or remove walls or drywall
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Property Owner: Yes
Comment: I would like to get an estimate for Remodel a Garage

Project: Remodel a Bathroom
Date: 07/09/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: Yes
Request for Commercial Location: No

Project: Remodel a Bathroom
Date: 07/08/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible

Project: Remodel a Garage
Date: 07/08/2019
Scope of Remodel: Enlarge existing garage
Storage cabinets / shelving: No - I do not plan to add or update the cabinets / shelving
Garage doors: Yes - I plan to update the garage doors
Insulation: No - I do not plan to add insulation
Flooring: No - I do not plan to update the flooring
Electrical: No - I do not plan to update the lighting or electrical fixtures
Interior walls or drywall: Yes - I plan to add or remove walls or drywall
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Property Owner: Yes

Project: Remodel a Garage
Date: 07/06/2019
Scope of Remodel: Completely remodel garage
Storage cabinets / shelving: No - I do not plan to add or update the cabinets / shelving
Garage doors: No - I do not plan to update the garage doors
Insulation: No - I do not plan to add insulation
Flooring: No - I do not plan to update the flooring
Electrical: No - I do not plan to update the lighting or electrical fixtures
Interior walls or drywall: No - I do not plan to add or remove walls or drywall
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence

Project: Remodel a Kitchen
Date: 07/05/2019
Floorplan: I am considering changes to kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes
Comment: The house is 13 years old and needs updating. The kitchen is the first remodel but the bathrooms are next. The kitchen footprint is large and adequate. All the appliances will be replaced except for dishwasher. We haven't designed the layout but relocating the sink waterline is likely. Ceiling light fixtures need to be updated. The counter tops and floor and wall tiles will be replaced. The cabinets will be replaced. We are looking for a much brighter and whiter kitchen. The adjoining living room and family room walls need painting and a few minor wall stucco changes. The kitchen has exterior brick on the counter top walls and surrounding the cooking stove and vent. We want to remove all the brick. The laundry room next to kitchen will also be painted, new tile flooring and sink/counter top. We want a larger refrigerator space with the cabinets design. The only people we are working with now are Kent Moore cabinets to see what they can do for us - first meeting in 2 weeks.

Project: Renovate or Repair a Home
Date: 07/04/2019
Project Description: Other
Project Type: Interior
Work included: Drywall, Flooring, Painting, Electrical, Plumbing, Cabinets, Tile, Countertops
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: Install porcelain tile flooring in entire unit, approx. 900 sq. feet, replace 2 toilets, repair a leak in bathtub, replace cabinets in kitchen and vanities in the bathrooms, install interior doors, small electric repair of light fixture in the laundry area and repair a small portion of drywall. This is in a condo, price and materials are important.

Project: Remodel or Renovate One or More Rooms
Date: 07/04/2019
Nature of project: Other
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence

Project: Remodel a Bathroom
Date: 07/03/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Comment: Master bathroom remodel - replace flooring, bathtub, shower, cabinets, sinks and lighting.