C.V. Sanders Co.

P.O. Box 985, Kirkland, WA 98083
(425) 868-3093
Is this your business?
Claim Your Listing
!

Please Note: This business is not a current member of the HomeAdvisor network.  Learn about our screening process

Business Information


QUICK FACTS

Business Hours

12:00 am - 12:00 am (Please call to confirm)

  • Free Estimates
  • Credit Cards Accepted
  • Bilingual

SERVICES OFFERED

Additions & Remodeling

SERVICE AREA

Seattle

CREDENTIALS

State Licensing

Trade:

License #: CVSANCI022BK

Expiration: Sat Aug 13 18:00:00 MDT 2005

BUSINESS OVERVIEW

C.V. Sanders Company specializes in Home Renovation, maintenance and repairs. We work with home owners who are looking for Quality, Reliability, and Integrity. We take a personal approach to every job knowing your home is one of your greatest assests. We use only the best tools and equipment combined with experience to assure the best possible results. We are a full service General Contractor. Give us a call today. 425-868-3093

Get Quotes
From up to 3 Prescreened
Additions & Remodeling Pros


 1 Enter ZIP Code

 2 Describe Project

 3 Get Quotes

Service Professional? Join HomeAdvisor to Get Leads Like These

Recent Job Requests for Addition & Remodeling Contractors in Kirkland, WA:


Project: Remodel or Renovate One or More Rooms
Location: Kirkland, WA
Date: 06/23/2019
Are you planning to remodel a master bedroom?: No
How many bedrooms do you want to remodel?: 2
How extensively do you want to remodel your bedroom(s)?: I plan to maintain the existing floorplan
Design Preparation: Sketches and/or basic idea of project
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes
Comment: Two bedrooms - 1) remove popcorn ceiling, 2) repair walls and re-drywall ceiling and walls for new prime and paint; 3) Prime and paint walls and ceiling; 4) New white baseboards matching other remodeled space in basement; 5) New Oak closet doors matching others in the house in type and stain - stain and install; 6) Recessed lighting installed in rooms;

Project: Remodel a Bathroom
Location: Kirkland, WA
Date: 06/21/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible

Project: Remodel a Kitchen
Location: Kirkland, WA
Date: 06/21/2019
Floorplan: I am considering changes to kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: No - I do not plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
What kind of location is this?: Home/Residence

Project: Remodel a Bathroom
Location: Kirkland, WA
Date: 06/20/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: I would like to get an estimate for a bathroom remodel in LATE JULY time period

Project: Remodel a Basement
Location: Kirkland, WA
Date: 06/19/2019
Basement Features: Bathroom(s), Bedroom(s), Separate Apartment, Kitchen
Design Preparation: None
Basement Area Description: Partially Finished
Square Footage: More than 800 (large)
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Property Owner: No
Historical Work: No
Covered by Insurance: No
Comment: Looking to renovate daylight basement of a split level home for sale. Mostly unfinished space with open and high ceilings. Want it to be separate living quarters for elderly parents. Looking to purchase home and would want to have work done immediately within the next 60 days if possible before moving in.

Project: Remodel a Bathroom
Location: Kirkland, WA
Date: 06/18/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: I would like to get an estimate for

Project: Remodel a Garage
Location: Kirkland, WA
Date: 06/18/2019
Scope of Remodel: Completely remodel garage
Storage cabinets / shelving: Yes - I plan to add or update the cabinets / shelving
Garage doors: Yes - I plan to update the garage doors
Insulation: Yes - I plan to add insulation
Flooring: Yes - I plan to update the flooring
Electrical: Yes - I plan to update the lighting or electrical fixtures
Interior walls or drywall: Yes - I plan to add or remove walls or drywall
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Property Owner: Yes
Comment: I would like to get an estimate for

Project: Remodel a Kitchen
Location: Kirkland, WA
Date: 06/18/2019
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: No - I do not plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Lighting: No - I do not plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes
Comment: Kitchen remodel. Removing a wall that divides living area with kitchen; and adding countertop. Changing two older appliances. Updating sink.

Project: Remodel a Bathroom
Location: Kirkland, WA
Date: 06/17/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: 1) Need to update a 1980s main bathroom - replace existing tub/shower (entire surround - would prefer a 'one piece' if available), flooring, molding, vanity, light, mirror (perhaps) and ADA height toilet. Install exhaust fan. I will repaint walls and ceiling when that time comes. 2) Need to replace a poorly done (professional*) 2004 master bath remodel: shower stall (again, would prefer a 'one piece', if available), walls, flooring, lighting, exhaust fan and ADA height toilet. Vanity, countertop, mirror and sink OK. I will repaint walls and ceiling when that time comes. *When I realized there were issues, I found company (which had been in business a long while) had gone out of business. Bathrooms 1 & 2 share a common wall. These are the priority. 3) Update half bath in family room: replace lighting, fan, sink, vanity, countertop, flooring. Install ADA toilet. Possible pocket door installation. I will remove wallpaper and repaint walls and ceiling when that time comes

Project: Build an Addition
Location: Kirkland, WA
Date: 06/16/2019
Project Description: Design and build
Type of Addition: Ground level addition
Rooms Included:: Bathroom, Bedroom(s), Deck/Porch
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Request for Commercial Location: No
Comment: We have a 2000 sq foot ranch house including garage. Looking to turn it into an L-shape extending out into the back garden, for approx another 1000-1200 sq ft. Will need to move some walls in the "old" house as well, but primarily looking to cost out the extra 1000-1200 sq ft extension.