D A Johnson Inc

3021 N. Hancock Ave. , Suite 260, Colorado Springs, CO 80907
(719) 499-0673
4.43 | 5 Verified Ratings
Is this your business?
Claim Your Listing
!

Please Note: This business is not a current member of the HomeAdvisor network.  Learn about our screening process

Business Information


QUICK FACTS

Business Hours

12:00 am - 12:00 am (Please call to confirm)

  • Credit Cards Accepted
  • Bilingual

SERVICES OFFERED

Additions & Remodeling

SERVICE AREA

Colorado Springs

BUSINESS OVERVIEW

D.A. Johnson Inc. Home Builder and Remodeler is a locally owned company and has been serving the front range community since 1984. We are listed in the Yellow Pages under Contractors- Remodel & Repair

Get Quotes
From up to 3 Prescreened
Additions & Remodeling Pros


 1 Enter ZIP Code

 2 Describe Project

 3 Get Quotes

Ratings & Reviews

D A Johnson Inc
Showing 1-5 of 5
  Page 1 of 1  
Sort by newest   Date ▼   Rating  
4.0   |  
Review by in Colorado Springs, CO
New home builder to the area, and while Dan was great, many of his subs were sub standard and are no longer around.
Was this review helpful?  
4.0   |  
Review by in Colorado Springs, CO
Although the regional building dept wouldn't allow the work to be done I requested, Dan Johnson Was very prompt and professional.
Was this review helpful?  
4.33   |  
Review by in Manitou Springs, CO
Was this review helpful?  
4.5   |  
Review by in Colorado Springs, CO
I was very please with the work Dan and his team did on the two porches I had rebuilt. I believe my house will fall down before the porches do!
Was this review helpful?  
4.17   |  
Review by in Colorado Springs, CO
Was this review helpful?  
Showing 1-5 of 5
  Page 1 of 1  

Service Professional? Join HomeAdvisor to Get Leads Like These

Recent Job Requests for Addition & Remodeling Contractors in Colorado Springs, CO:


Project: Remodel a Kitchen
Date: 06/17/2019
Floorplan: I am considering changes to kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: No - I do not plan to move or update the appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
What kind of location is this?: Home/Residence

Project: Remodel a Kitchen
Date: 06/17/2019
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: No - I do not plan to move or update the cabinets
Appliances: No - I do not plan to move or update the appliances
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Lighting: No - I do not plan to update the lighting
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Comment: Close an existing window. Open and install a new window into an outside structural wall

Project: Remodel a Bathroom
Date: 06/17/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Comment: New sink ,new flooring ,new shower head, reset toilet at same location as it was small amount of drywall work and paint (very small bathroom)

Project: Remodel a Kitchen
Date: 06/17/2019
Floorplan: I am considering changes to kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes
Comment: Removing an existing non-load bearing wall, creating an island; all new floors, lighting, sink, stove/oven.

Project: Remodel a Kitchen
Date: 06/17/2019
Floorplan: I am considering changes to kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes
Comment: Removing an existing non-load bearing wall, creating an island; all new floors, lighting, sink, stove/oven.

Project: Renovate or Repair a Home
Date: 06/17/2019
Project Description: Major renovation
Project Type: Interior
Work included: Drywall, Flooring, Other
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: We would like to knock out the wall/electric fireplace between our living room and dining room to open these two rooms to each other, and install built-in bookshelves/entertainment center where the wall now stands.

Project: Renovate or Repair a Home
Date: 06/17/2019
Project Description: Other
Project Type: Exterior
Work included: Electrical, Plumbing
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: Cap gas line and discount electricity to out door pool

Project: Remodel a Bathroom
Date: 06/17/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Comment: Would like an on-site estimate done between June 24 - June 28. Planning for the work window to be the 3rd to 4th week of August. Small bathroom.

Project: Remodel or Renovate One or More Rooms
Date: 06/17/2019
Are you planning to remodel a master bedroom?: No
How many bedrooms do you want to remodel?: 1
How extensively do you want to remodel your bedroom(s)?: I plan to maintain the existing floorplan
Design Preparation: None
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes
Comment: Need french doors added to office/bedroom.

Project: Remodel a Bathroom
Date: 06/17/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months