Duncan Construction, Inc.

2877 N.E. Garden Ave., Corvallis, OR 97330
(541) 758-6379
Is this your business?
Claim Your Listing
!

Please Note: This business is not a current member of the HomeAdvisor network.  Learn about our screening process

Business Information


QUICK FACTS

Business Hours

12:00 am - 12:00 am (Please call to confirm)

  • Credit Cards Accepted
  • Bilingual

SERVICES OFFERED

Additions & Remodeling

SERVICE AREA

Corvallis

CREDENTIALS

State Licensing

Trade:

License #: 31467

Expiration: Sat Aug 04 18:00:00 MDT 2012

BUSINESS OVERVIEW

Duncan Construction, Inc., has been doing business since 1990. They are family owned business. They can service all of your contracting and maintenance needs for commercial businesses.

Get Quotes
From up to 3 Prescreened
Additions & Remodeling Pros


 1 Enter ZIP Code

 2 Describe Project

 3 Get Quotes

Service Professional? Join HomeAdvisor to Get Leads Like These

Recent Job Requests for Addition & Remodeling Contractors in Corvallis, OR:


Project: Build an Addition
Location: Corvallis, OR
Date: 06/20/2019
Project Description: Build - Use existing architectural drawings
Type of Addition: Remodel existing space
Rooms Included:: Garage/Workshop
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Request for Commercial Location: No

Project: Build an Addition
Date: 06/19/2019
Project Description: Design and build
Type of Addition: Ground level addition
Rooms Included:: Bathroom, Laundry/Mud room
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Request for Commercial Location: No
Comment: Add bathroom with shower and attached utility room on side of house. Width about 5 1/2', length about 17'.

Project: Remodel a Bathroom
Location: Corvallis, OR
Date: 06/19/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Comment: I have a bathroom with a toilet, vanity and full size tub/shower. I would like to replace the tub/shower with a shower stall and also replace the vanity and sink.

Project: Remodel a Garage
Location: Corvallis, OR
Date: 06/17/2019
Scope of Remodel: Completely remodel garage
Storage cabinets / shelving: No - I do not plan to add or update the cabinets / shelving
Garage doors: Yes - I plan to update the garage doors
Insulation: Yes - I plan to add insulation
Flooring: Yes - I plan to update the flooring
Electrical: Yes - I plan to update the lighting or electrical fixtures
Interior walls or drywall: Yes - I plan to add or remove walls or drywall
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence

Project: Remodel a Kitchen
Location: Corvallis, OR
Date: 06/16/2019
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: No - I do not plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Comment: House closes the first week of July. Need a bid sometime later in July.

Project: Add a Sunroom or Patio Enclosure
Location: Corvallis, OR
Date: 06/15/2019
Project Description: Build a new sunroom or enclosed patio or porch
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 weeks
What kind of location is this?: Home/Residence
Comment: We want to convert our old patio into a solarium, a rain-proof room with a knee wall, transparent roofing, and screened windows. It will require foundation work as the existing patio is a cracked concrete slab that is well below the desired floor level (which should be level with our existing sliding glass door).

Project: Remodel a Bathroom
Location: Corvallis, OR
Date: 06/13/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible

Project: Renovate or Repair a Home
Location: Corvallis, OR
Date: 06/13/2019
Project Description: Major home repair project
Project Type: Interior
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence

Project: Remodel a Bathroom
Location: Corvallis, OR
Date: 06/08/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months

Project: Remodel a Bathroom
Location: Corvallis, OR
Date: 06/08/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Comment: Tub needs to be replace or painted