Company Logo

EYT Construction, Inc.

222 W. Cermak Rd. Suite 308, Chicago, IL 60616
(312) 326-4888
Is this your business?
Claim Your Listing
!

Please Note: This business is not a current member of the HomeAdvisor network.  Learn about our screening process

Business Information


QUICK FACTS

Business Hours

12:00 am - 12:00 am (Please call to confirm)

  • Free Estimates
  • Credit Cards Accepted
  • Bilingual

SERVICES OFFERED

Additions & Remodeling

SERVICE AREA

Chicago

BUSINESS OVERVIEW

EYT Construction is a locally owned, full-service company that offers both architecture and construction services in the State of Illinois. Our combined work force has over 75 years experience in the construction business. We work with one client at a time to ensure a good relationship including good services from design phase through the construction phase. We also manufacture our own kitchen and bathroom products used by many local builders.

Get Quotes
From up to 3 Prescreened
Additions & Remodeling Pros


 1 Enter ZIP Code

 2 Describe Project

 3 Get Quotes

Service Professional? Join HomeAdvisor to Get Leads Like These

Recent Job Requests for Addition & Remodeling Contractors in Chicago, IL:


Project: Remodel a Bathroom
Location: Chicago, IL
Date: 05/22/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: I would like to get an estimate for remodeling multiple bathrooms in my condo. Some floorplan changes will be done

Project: Remodel a Bathroom
Location: Chicago, IL
Date: 05/22/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months

Project: Remodel a Basement
Location: Chicago, IL
Date: 05/22/2019
Basement Features: Exercise Area
Design Preparation: None
Basement Area Description: Partially Finished
Square Footage: 400 - 800 (medium)
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Property Owner: Yes
Historical Work: No
Covered by Insurance: No
Comment: I already have an in-law suite and bathroom in my basement, but I would like the rest of the basement finished-meaning walls, floors, lighting. I would like someone to give me an estimate as I have no idea what it would cost or how much value it could potentially add to my home.

Project: Remodel a Bathroom
Location: Chicago, IL
Date: 05/22/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: install walk in shower

Project: Renovate or Repair a Home
Location: CHICAGO, IL
Date: 05/22/2019
Project Description: Major renovation
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
What kind of location is this?: Home/Residence

Project: Remodel a Kitchen
Location: CHICAGO, IL
Date: 05/22/2019
Floorplan: I am considering changes to kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
What kind of location is this?: Home/Residence

Project: Remodel a Bathroom
Location: Chicago, IL
Date: 05/22/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: Gut remodel of an existing 100 SF master bathroom in a loft condo. We have a plan in mind and plan to purchase our own materials, but need a full execution from architecture drawings to tile installation.

Project: Remodel a Garage
Location: Chicago, IL
Date: 05/22/2019
Scope of Remodel: Enlarge existing garage
Storage cabinets / shelving: No - I do not plan to add or update the cabinets / shelving
Garage doors: No - I do not plan to update the garage doors
Insulation: No - I do not plan to add insulation
Flooring: No - I do not plan to update the flooring
Electrical: No - I do not plan to update the lighting or electrical fixtures
Interior walls or drywall: No - I do not plan to add or remove walls or drywall
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Property Owner: Yes
Comment: Garage door I want to be wider

Project: Build an Addition
Location: Chicago, IL
Date: 05/22/2019
Project Description: Build - Use existing architectural drawings
Type of Addition: Second story addition
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Request for Commercial Location: No

Project: Remodel a Bathroom
Location: Chicago, IL
Date: 05/22/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: I would like to update my bath rooms and put down hardwood floors in the living and dining area and ceramic tile for the kitchen.