G Phillips Construction, Inc.

221 N. Greenview Ave., Mundelein, IL 60060
(847) 566-1981
5.0 | 1 Verified Ratings
Is this your business?
Claim Your Listing
!

Please Note: This business is not a screened and approved member of HomeAdvisor.  Learn about our screening process

Business Information


QUICK FACTS

Business Hours

12:00 am - 12:00 am (Please call to confirm)

  • Credit Cards Accepted
  • Bilingual

SERVICES OFFERED

Additions & Remodeling

SERVICE AREA

Chicago

BUSINESS OVERVIEW

G Phillips Construction, Inc., is family owned and operated. We have 30 years of experience in this business and pride ourselves in customer satisfaction. Call today for your consultation!

Get Quotes
From up to 3 Prescreened
Additions & Remodeling Pros


 1 Enter ZIP Code

 2 Describe Project

 3 Get Quotes

Ratings & Reviews

G Phillips Construction, Inc.
Showing 1-1 of 1
  Page 1 of 1  
Sort by newest   Date ▼   Rating  
5.0   |  
Review by
Project: Remodel a Kitchen
We are so happy with his work. He is always good about the follow up after the work. They are very detailed, creative and give great solutions for the work.
Showing 1-1 of 1
  Page 1 of 1  

Service Professional? Join HomeAdvisor to Get Leads Like These

Recent Job Requests for Addition & Remodeling Contractors in Mundelein, IL:


Project: Remodel a Bathroom
Location: Mundelein, IL
Date: 10/18/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: Project Involves 2 Full and 1/2 bath 3 Vanities and counter tops including splash 3 Toilets 1 Shower including Tile surround 1 Bathtub including Tile surround 2 Floors in Full Baths Nothing fancy......just a nice fresh affordable upgrade to all 3 bathrooms.....

Project: Remodel or Renovate One or More Rooms
Location: Mundelein, IL
Date: 10/18/2017
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence

Project: Remodel a Bathroom
Location: Mundelein, IL
Date: 10/12/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months

Project: Build an Addition
Location: Mundelein, IL
Date: 09/2017
Project Description: Design and build
Type of Addition: Ground level addition
Rooms Included:: Living/Family room
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Request for Commercial Location: No
Comment: Dinning room addition with screen porch. Upgrade electric from 60Amps to 200.

Project: Add a Sunroom or Patio Enclosure
Location: Mundelein, IL
Date: 09/2017
Project Description: Build a new sunroom or enclosed patio or porch
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Comment: Need to replace our deck next summer and thinking of adding a sunroom or screenroom.

Project: Remodel a Kitchen
Location: Mundelein, IL
Date: 09/2017
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: No - I do not plan to move or update the appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: No - I do not plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes
Comment: Small kitchen requires new floor, countertops and possibly cabinets.

Project: Remodel a Bathroom
Location: Mundelein, IL
Date: 09/2017
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: Small townhouse, small bathroom, small kitchen. Would not need "top of the line" stuff, but in the right circumstances I could be talked into a new bathroom and new kitchen cabinets, floor, and countertops.

Project: Remodel a Basement
Location: Mundelein, IL
Date: 09/2017
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence

Project: Remodel or Renovate One or More Rooms
Location: Mundelein, IL
Date: 09/2017
Nature of project: Remodel / update the entire home
Rooms to be Remodeled: Kitchen, Bathroom(s), Laundry room, Family room
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
What kind of location is this?: Home/Residence

Project: Remodel a Bathroom
Location: Mundelein, IL
Date: 09/2017
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Comment: Possibly 2 bathrooms to update/remodel