Company Logo

GuyCo

835 Halyard Drive, Avon, IN 46123
(317) 272-2236
4.0 | 1 Verified Ratings
Is this your business?
Claim Your Listing
!

Please Note: This business is not a current member of the HomeAdvisor network.  Learn about our screening process

Business Information


QUICK FACTS

Business Hours

12:00 am - 12:00 am (Please call to confirm)

  • Free Estimates
  • Credit Cards Accepted
  • Bilingual

SERVICES OFFERED

Additions & Remodeling

SERVICE AREA

Indianapolis

BUSINESS OVERVIEW

Complete customer satisfaction is our #1 goal at GuyCo! Functional, state of the art designs and superior materials teamed up with professional contractors and quality craftsmanship to bring forth the best possible product to our customers. GuyCo has raised the bar on home building and remodeling standards. Let GuyCo show you why we are in a league of our own!

Get Quotes
From up to 3 Prescreened
Additions & Remodeling Pros


 1 Enter ZIP Code

 2 Describe Project

 3 Get Quotes

Ratings & Reviews

GuyCo
Showing 1-1 of 1
  Page 1 of 1  
Sort by newest   Date ▼   Rating  
4.0   |  
Review by in Indianapolis, IN
Project: Kitchen Remodeling
Showing 1-1 of 1
  Page 1 of 1  

Service Professional? Join HomeAdvisor to Get Leads Like These

Recent Job Requests for Addition & Remodeling Contractors in Avon, IN:


Project: Remodel or Renovate One or More Rooms
Location: Avon, IN
Date: 07/17/2019
Nature of project: Reconfigure the current floor plan
On what floor is the room you want remodeled?: Main floor
Design Preparation: None
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes

Project: Remodel a Bathroom
Location: Avon, IN
Date: 07/16/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Comment: Replace tub/shower combo as well as toilet and re-do walls

Project: Remodel a Bathroom
Location: Avon, IN
Date: 07/15/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Comment: We want to do an overhaul on the bathroom

Project: Build an Addition
Location: Avon, IN
Date: 07/14/2019
Project Description: Design and build
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible

Project: Remodel a Kitchen
Location: Avon, IN
Date: 07/10/2019
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: No - I do not plan to move or update the appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Lighting: No - I do not plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
What kind of location is this?: Home/Residence
Comment: Remove and replace existing cabinets. Add a section of cabinets and countertop/desk. Add Quartz or granite countertops.

Project: Remodel a Bathroom
Location: Avon, IN
Date: 07/08/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Comment: Flooring is started. Needs finished. Purchased toilet, sink, vanity, counter top, trim and faucet. All need installed. Old already removed.

Project: Add a Sunroom or Patio Enclosure
Location: Avon, IN
Date: 07/08/2019
Project Description: Enclose existing patio or porch with roof, walls or windows
Request Stage: Ready to Hire
Desired Completion Date: More than 2 weeks
What kind of location is this?: Home/Residence

Project: Add a Sunroom or Patio Enclosure
Location: Avon, IN
Date: 07/08/2019
Project Description: Build a new sunroom or enclosed patio or porch
Request Stage: Planning & Budgeting
Desired Completion Date: Within 1 week
What kind of location is this?: Home/Residence
Comment: Build a sunroom on existing patio

Project: Remodel or Renovate One or More Rooms
Location: Avon, IN
Date: 07/06/2019
Nature of project: Remodel / update the entire home
Rooms to be Remodeled: Kitchen, Bathroom(s), Bedroom(s), Laundry room, Living room
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Comment: Major remodel for a house that has fire damage. Looking to buy and flip house. Need a company that is experienced in all areas for a major remodel.

Project: Add a Sunroom or Patio Enclosure
Location: Avon, IN
Date: 07/02/2019
Project Description: Build a new sunroom or enclosed patio or porch
Request Stage: Planning & Budgeting
Desired Completion Date: Within 1 week
What kind of location is this?: Home/Residence
Property Owner: Yes
Comment: Build a sunroom.