JMW, Inc.

P.O. Box 634, Troutville, VA 24175
(540) 966-1023
Is this your business?
Claim Your Listing
!

Please Note: This business is not a current member of the HomeAdvisor network.  Learn about our screening process

Business Information


QUICK FACTS

Business Hours

12:00 am - 12:00 am (Please call to confirm)

  • Free Estimates
  • Credit Cards Accepted
  • Bilingual

SERVICES OFFERED

Additions & Remodeling

SERVICE AREA

Roanoke

CREDENTIALS

State Licensing

Trade:

License #: 2705049683A

Expiration: Sun Apr 29 18:00:00 MDT 2007

Get Quotes
From up to 3 Prescreened
Additions & Remodeling Pros


 1 Enter ZIP Code

 2 Describe Project

 3 Get Quotes

Service Professional? Join HomeAdvisor to Get Leads Like These

Recent Job Requests for Addition & Remodeling Contractors in Troutville, VA:


Project: Remodel a Kitchen
Location: Troutville, VA
Date: 07/21/2019
Floorplan: I am considering changes to kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: No - I do not plan to move or update the appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes

Project: Renovate or Repair a Home
Location: Troutville, VA
Date: 07/19/2019
Project Description: Major home repair project
Project Type: Exterior
Work included: Deck, Porch or Patio
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: Remove existing deck approx. 750 sq. ft. - reinstall new deck

Project: Remodel a Bathroom
Location: Troutville, VA
Date: 07/08/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: we have ordered cabinets, vanity top, sinks, faucets, toilet, and we are looking at tile for the floor in the bath. the tub and shower will remain in place. one electrical box will need to be moved up about 5-6 inches.

Project: Remodel a Bathroom
Location: Troutville, VA
Date: 07/08/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Comment: I would like new shower faucets/shower head. the tub re-caulked, the toilet re-set or replaced.

Project: Remodel a Bathroom
Location: TROUTVILLE, VA
Date: 07/08/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Comment: We would like a large jetted tub and tile deck to be removed, and replace with a vessel /freestanding tub. Lanolium flooring removed, tile installed. Already have tile.

Project: Build an Addition
Location: Troutville, VA
Date: 06/2019
Project Description: Design and build
Type of Addition: Ground level addition
Rooms Included:: Garage/Workshop
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Request for Commercial Location: No
Comment: Garage addition

Project: Remodel or Renovate One or More Rooms
Location: Troutville, VA
Date: 06/2019
Nature of project: Remodel as part of home addition
On what floor is the room you want remodeled?: Main floor
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence

Project: Renovate or Repair a Home
Location: Troutville, VA
Date: 06/2019
Project Description: Major home repair project
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Comment: Water damage on recently purchased home. Taking seller to court. Need expert witness.

Project: Remodel a Bathroom
Location: Troutville, VA
Date: 06/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No

Project: Remodel a Bathroom
Location: Troutville, VA
Date: 05/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: Bathroom remodel. In search of WOMAN Contractor