MERCHANT CONSTRUCTION

717 E. 22nd St, South Sioux City, NE 68776
(402) 494-6264
Is this your business?
Claim Your Listing
!

Please Note: This business is not a current member of the HomeAdvisor network.  Learn about our screening process

Business Information


QUICK FACTS

Business Hours

12:00 am - 12:00 am (Please call to confirm)

  • Free Estimates
  • Credit Cards Accepted
  • Bilingual

SERVICES OFFERED

Additions & Remodeling

SERVICE AREA

Sioux City

Get Quotes
From up to 3 Prescreened
Additions & Remodeling Pros


 1 Enter ZIP Code

 2 Describe Project

 3 Get Quotes

Service Professional? Join HomeAdvisor to Get Leads Like These

Recent Job Requests for Addition & Remodeling Contractors in South Sioux City, NE:


Project: Build an Addition
Date: 07/02/2019
Project Description: Design and build
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible

Project: Remodel a Bathroom
Date: 06/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Comment: Update bathroom and check for mold

Project: Remodel a Kitchen
Date: 05/2019
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Lighting: No - I do not plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence

Project: Build an Addition
Date: 05/2019
Project Description: Design and build
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Comment: First home

Project: Build an Addition
Date: 05/2019
Project Description: Build - Use existing architectural drawings
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Comment: New basement under old house

Project: Remodel a Bathroom
Date: 04/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible

Project: Remodel a Basement
Date: 03/2019
Basement Features: Bathroom(s), Bedroom(s)
Design Preparation: Sketches of basic idea of project
Basement Area Description: Partially Finished
Square Footage: 400 - 800 (medium)
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Property Owner: Yes
Historical Work: No
Covered by Insurance: No
Comment: We are looking to add a bathroom and bedroom to the basement. The exterior drywall has been hung but is not finished. We need plumbing installed to accommodate the bathroom installation. The bedroom needs to be framed and drywall installed. We would also like to have two egress windows installed. We are flexible on the flooring, but thinking about doing some kind of decorative concrete staining.

Project: Build an Addition
Date: 03/2019
Project Description: Build - Use existing architectural drawings
Type of Addition: Second story addition
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months

Project: Remodel a Bathroom
Date: 03/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No

Project: Build an Addition
Date: 03/2019
Project Description: Design and build
Type of Addition: Ground level addition
Rooms Included:: Bathroom, Bedroom(s), Laundry/Mud room
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Request for Commercial Location: No
Comment: Plan to add on 13 x 23 room addition to an existing structure which would include masterbath, laundry, and master bedroom