Owens Corning

7968 Zionsville Rd., Indianapolis, IN 46268
(800) 662-8500
Is this your business?
Claim Your Listing
!

Please Note: This business is not a current member of the HomeAdvisor network.  Learn about our screening process

Business Information


QUICK FACTS

Business Hours

12:00 am - 12:00 am (Please call to confirm)

  • Free Estimates
  • Credit Cards Accepted
  • Bilingual

SERVICES OFFERED

Additions & Remodeling

SERVICE AREA

Indianapolis

BUSINESS OVERVIEW

The HOMExperts team of professionals is a locally staffed and managed division of Owens Corning that is focused on providing consumers with a reliable and trustworthy resource for handyman, home improvement, and remodeling services. The HOMExpertd professionals will perform your work on time, on your schedule and to your satisfaction. Owens Corning is a world-class leader is the building materials industry that is dedicated to understanding and improving how the home works.

Get Quotes
From up to 3 Prescreened
Additions & Remodeling Pros


 1 Enter ZIP Code

 2 Describe Project

 3 Get Quotes

Service Professional? Join HomeAdvisor to Get Leads Like These

Recent Job Requests for Addition & Remodeling Contractors in Indianapolis, IN:


Project: Renovate or Repair a Home
Date: 10/14/2019
Project Description: Major renovation
Project Type: Both
Work included: Drywall, Flooring, Doors and windows, Painting, Electrical, Plumbing, Roofing, Carpentry-finish, Cabinets, Siding, Tile, Countertops, Fencing, Landscaping, Heating and cooling, Foundation
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: looking for GC who is experienced in fix and flips

Project: Remodel a Bathroom
Date: 10/14/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Comment: Creating en-suite, moving laundry to make room for bathroom/ closet space attached to master bedroom.

Project: Remodel a Basement
Date: 10/14/2019
Basement Features: Bathroom(s), Laundry, Game Room
Design Preparation: None
Basement Area Description: Unfinished
Square Footage: 400 - 800 (medium)
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
What kind of location is this?: Home/Residence
Property Owner: Yes
Historical Work: No
Covered by Insurance: No
Comment: I would like to get a quote on how much it would be to finish the basement and add a full bathroom. Laundry is currently located in the basement and would like to make a laundry area and an open living room area. Ceilings are low.

Project: Remodel a Kitchen
Date: 10/14/2019
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes

Project: Renovate or Repair a Home
Date: 10/14/2019
Project Description: Several repair projects of varying nature

Project: Remodel a Bathroom
Date: 10/14/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Comment: This is a gut job down to the studs. Install new drywall, flooring, lighting, vanity, and toilet. Looking to get this started soon.

Project: Remodel a Kitchen
Date: 10/14/2019
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: No - I do not plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: No - I do not plan to update the lighting
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes
Comment: Looking at changing out the appliances, and new countertops, etc.

Project: Renovate or Repair a Home
Date: 10/14/2019
Project Description: Major renovation
Project Type: Exterior
Work included: Painting, Carpentry-finish
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: wood around garage door opening rotten and needs replaced.

Project: Remodel a Bathroom
Date: 10/14/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: New ceiling for part, new toilet, new tile in shower and around the tub, new flooring, new shower door. Ready Togo with this project ASAP.

Project: Remodel a Kitchen
Date: 10/14/2019
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: No - I do not plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Comment: Remodel the entire kitchen