Painted Desert Builders, Inc.

17427 N. 63rd Drive, Glendale, AZ 85308
(623) 239-8061
5.0 | 1 Verified Ratings
Is this your business?
Claim Your Listing
!

Please Note: This business is not a current member of the HomeAdvisor network.  Learn about our screening process

Business Information


QUICK FACTS

Business Hours

7:00 am - 3:00 pm (Please call to confirm)

  • Credit Cards Accepted
  • Bilingual

SERVICES OFFERED

Additions & Remodeling

SERVICE AREA

Phoenix

CREDENTIALS

State Licensing

Trade:

License #: 212216

Expiration: Thu Oct 08 18:00:00 MDT 2009

BUSINESS OVERVIEW

Painted Desert Builders Inc. is your local one stop shop for all your homes construction needs. In business since 2005 with a combined product knowledge spanning over the last 25 yrs. Give us a call!!

Get Quotes
From up to 3 Prescreened
Additions & Remodeling Pros


 1 Enter ZIP Code

 2 Describe Project

 3 Get Quotes

Ratings & Reviews

Painted Desert Builders, Inc.
Showing 1-1 of 1
  Page 1 of 1  
Sort by newest   Date ▼   Rating  
5.0   |  
Review by
Project: Build an Addition
I think that he is very trustworthy. He really work hard to do a good job and is very good at cleaning up after the work.
Showing 1-1 of 1
  Page 1 of 1  

Service Professional? Join HomeAdvisor to Get Leads Like These

Recent Job Requests for Addition & Remodeling Contractors in Glendale, AZ:


Project: Remodel a Kitchen
Location: Glendale, AZ
Date: 12/09/2018
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months

Project: Renovate or Repair a Home
Location: Glendale, AZ
Date: 12/08/2018
Project Description: Major renovation
Project Type: Interior
Work included: Drywall, Flooring, Doors and windows, Painting, Electrical, Plumbing, Framing, Carpentry-finish, Cabinets, Insulation
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: Remodel of master bedroom bath including reconfiguring vanity, shower, toilet. As well as turning adjacent bedroom into a master bedroom closet with walk thru entrance from master bathroom.

Project: Remodel a Bathroom
Location: Glendale, AZ
Date: 12/07/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: Convert tub/shower to shower only, replace toilet, vanity, sink and flooring.

Project: Remodel a Kitchen
Location: Glendale, AZ
Date: 12/07/2018
Floorplan: I am considering changes to kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Comment: Want to totally update kitchen. Floor is tiled bad job, and slanted

Project: Remodel a Kitchen
Location: Glendale, AZ
Date: 12/06/2018
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: No - I do not plan to move or update the cabinets
Appliances: No - I do not plan to move or update the appliances
Countertops: Yes - I plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: No - I do not plan to update the lighting
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes
Comment: We want to replace the countertops and the floor.

Project: Remodel or Renovate One or More Rooms
Location: Glendale, AZ
Date: 12/06/2018
Nature of project: Remodel / update a few rooms
Rooms to be Remodeled: Bathroom(s), Bedroom(s), Living room
Design Preparation: None
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes
Comment: I have a back room and master bath that needs to be renovated. Master bathroom is already gutted and looking to have it updated and finished. Master Bedroom will need inspection of the studs along 2 walls to make sure there is no wood rot or termite damage. Then once that room is done the main bathroom will need to be gutted and updated and 2 additional rooms, hallway, living room, and another room need wood laminate flooring installed. I would like to purchase all the supplies needed as well. Both master bath and main bath are small.

Project: Remodel or Renovate One or More Rooms
Location: Glendale, AZ
Date: 12/06/2018
Select the room(s) that will be part of your remodel.: Other
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Comment: Roof overhang cutback

Project: Remodel a Bathroom
Location: Glendale, AZ
Date: 12/04/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Comment: Greek shower to walking in shower Need to be filled with concrete..

Project: Build an Addition
Location: Glendale, AZ
Date: 12/04/2018
Project Description: Design and build
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Comment: Our church currently has a small stage and we want some moderation to the stage. It’s about 2 feet high and build out of wood.

Project: Remodel a Bathroom
Location: Glendale, AZ
Date: 12/03/2018
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: Want to convert 2 baths into one large one. Convert shower to jetted tub + convert tub into NICE shower for 6'7" husband !!! Have good down payment - can reduce area to ONE toilet, new vanity with 2 sinks. Looking for VERY EXPERIENCED GC ( I am a former builder so I don't want BS ) . Want some REALISTIC quotes ASAP. E-mail xxxxxx here xxxxxxxxxxxxxxxxxxxxxx GLENDALE PHOENIX line