S.I.M. Tech Construction & Demolition, Inc.

31 Boulevard Rd., Arlington, MA 02474
(781) 856-6409
Is this your business?
Claim Your Listing
!

Please Note: This business is not a current member of the HomeAdvisor network.  Learn about our screening process

Business Information


QUICK FACTS

Business Hours

12:00 am - 12:00 am (Please call to confirm)

  • Free Estimates
  • Credit Cards Accepted
  • Bilingual

SERVICES OFFERED

Additions & Remodeling

SERVICE AREA

Boston

CREDENTIALS

State Licensing

Trade:

License #: 139696

Expiration: Thu Aug 04 18:00:00 MDT 2005

BUSINESS OVERVIEW

Andrew Ratner of S.I.M. Tech Construction & Demolition, Inc has many years experience in the residential home improvement field. We take pride in our quality work and ensure 100% customer satisfaction on every job. If you have a home improvement project use S.I.M. Tech Construction & Demolition, Inc for best results.

Get Quotes
From up to 3 Prescreened
Additions & Remodeling Pros


 1 Enter ZIP Code

 2 Describe Project

 3 Get Quotes

Service Professional? Join HomeAdvisor to Get Leads Like These

Recent Job Requests for Addition & Remodeling Contractors in Arlington, MA:


Project: Remodel a Bathroom
Location: Arlington, MA
Date: 06/21/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: Need to remodel a 1970s/80s era bathroom. Need to replace tub, sink/vanity, wall tiles and tiled floor. Need to replace medicine chest/mirror/light combo with modern wall mirror and lighting.

Project: Renovate or Repair a Home
Location: Arlington, MA
Date: 06/20/2019
Project Description: Major home repair project
Project Type: Both
Work included: Doors and windows, Painting, Foundation
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: Detached garage is in need of repair, major tasks envisioned Replace all windows; total of 6; two back, 1 each side, 1 each front and back Replace both doors and tracks Replace cellar rear door Repaint with yellow; similar to existing color Inspect/repair structural integrity; Notes: Cellar beams were treated for termite damage circa 2004-05 There is some bowing of the cellar front wall Cellar left rear wall was repaired circa 2004-05

Project: Remodel a Bathroom
Location: Arlington, MA
Date: 06/18/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Comment: We need to remove a whirlpool tub and replace it with a large shower. Also, replace toilet and tile floor.

Project: Remodel a Bathroom
Location: Arlington, MA
Date: 06/18/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: small bathroom. Needs new tub, sink, replace existing gas heater. Rip out shower enclosure and window. Replace with simpler solution. Don't see the need to spend $8-$10K on a plumber.

Project: Remodel a Kitchen
Location: Arlington, MA
Date: 06/17/2019
Floorplan: I am considering changes to kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: No - I do not plan to move or update the appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence

Project: Build an Addition
Location: Arlington, MA
Date: 06/17/2019
Project Description: Design and build
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Comment: Bathroom addition off the rear of the House.

Project: Renovate or Repair a Home
Location: Arlington, MA
Date: 06/16/2019
Project Description: Other
Project Type: Interior
Work included: Drywall, Flooring, Carpentry-finish, Other
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: We want to remove part of the wall between our living room and dining room. So that they will become a larger space for gatherings.

Project: Remodel a Bathroom
Date: 06/15/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible

Project: Build an Addition
Location: Arlington, MA
Date: 06/14/2019
Project Description: Design and build
Type of Addition: Ground level addition
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Request for Commercial Location: No
Comment: Need to build 5x8 mudroom at the back basement entry door. It is currently below grade and would like to build the small addition with internal steps that will exit above grade. There will need to be a small foundation and footing and single story room. Ready to move forward upon acceptance of reasonable quote.

Project: Remodel or Renovate One or More Rooms
Location: Arlington, MA
Date: 06/13/2019
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence