Stellar Builders Inc.

38 Totowa Rd., Wayne, NJ 07470
(973) 872-0908
Is this your business?
Claim Your Listing
!

Please Note: This business is not a current member of the HomeAdvisor network.  Learn about our screening process

Business Information


QUICK FACTS

Business Hours

12:00 am - 12:00 am (Please call to confirm)

  • Free Estimates
  • Credit Cards Accepted
  • Bilingual

SERVICES OFFERED

Additions & Remodeling

SERVICE AREA

New York

BUSINESS OVERVIEW

At Stellar Builders, we are a client-focused company. We have been in business for over 30 years and can help with all of your building needs. We are very familiar with Wayne and its surrounding areas. We are only a phone call away from assisting you with your next home improvement project. Visit our web site at www.stellarbuilders.com.

Get Quotes
From up to 3 Prescreened
Additions & Remodeling Pros


 1 Enter ZIP Code

 2 Describe Project

 3 Get Quotes

Service Professional? Join HomeAdvisor to Get Leads Like These

Recent Job Requests for Addition & Remodeling Contractors in Wayne, NJ:


Project: Build an Addition
Location: Wayne, NJ
Date: 07/20/2019
Project Description: Build - Use existing architectural drawings
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Comment: Adding an adddion and going up.

Project: Remodel a Basement
Location: Wayne, NJ
Date: 07/18/2019
Design Preparation: None
Basement Area Description: Finished
Square Footage: 400 - 800 (medium)
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Property Owner: Yes
Historical Work: No
Covered by Insurance: No
Comment: Need to get rid of mildew smell, need to remove walls,flooring, and ceiling .

Project: Remodel a Bathroom
Location: Wayne, NJ
Date: 07/17/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: Noticing leak in upstairs shower stall. Water is getting exposed to surrounding wall. Looking to replace shower, replace tile and fix walls.

Project: Remodel a Kitchen
Location: Wayne, NJ
Date: 07/14/2019
Floorplan: I am considering changes to kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Comment: Getting our kitchen gutted and wall knocked down to extend

Project: Remodel a Bathroom
Location: Wayne, NJ
Date: 07/14/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible

Project: Remodel a Kitchen
Location: Wayne, NJ
Date: 07/12/2019
Floorplan: I am considering changes to kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes

Project: Remodel or Renovate One or More Rooms
Location: Wayne, NJ
Date: 07/12/2019
Nature of project: Remodel / update a few rooms
Rooms to be Remodeled: Bathroom(s), Living room, Dining room, Family room
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence

Project: Renovate or Repair a Home
Location: Wayne, NJ
Date: 07/10/2019
Project Description: Major home repair project
Project Type: Both
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence

Project: Build an Addition
Location: Wayne, NJ
Date: 07/10/2019
Project Description: Build - Use existing architectural drawings
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Comment: Adding two bedrooms above garage and a family room below

Project: Remodel a Bathroom
Location: Wayne, NJ
Date: 07/10/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: Bathroom was remodeled 3+ years ago. Contractor made some major mistakes and negligence. Would like to use same quartz pattern for countertop and bathtub deck that I used last time (I have contacted Artistic Marble in Hawthorne about that. But vanity needs to be replaced and thus countertop needs to be replaced. Also, contractor changed my bathtub order into a different bathtub which is inadequate. So, I have selected a new bathtub and will need a new deck. I want drop-in Kohler bathtub which I have selected. Stall shower is fine.