Stewart Construction Inc

24 Pearl St., Essex Junction, VT 05452
(802) 879-0500
Is this your business?
Claim Your Listing
!

Please Note: This business is not a current member of the HomeAdvisor network.  Learn about our screening process

Business Information


QUICK FACTS

Business Hours

12:00 am - 12:00 am (Please call to confirm)

  • Credit Cards Accepted
  • Bilingual

SERVICES OFFERED

Additions & Remodeling

SERVICE AREA

Burlington

BUSINESS OVERVIEW

We are a locally owned and operated company that values honesty and integrity and treats your business as if it were our own. We offer a variety of General Contractor services that are customizable to each individual project. You will find us to be competitively priced, paying close attention to the details of each and every project that we are involved with. We look forward to building lasting relationships and guarantee your satisfaction!

Get Quotes
From up to 3 Prescreened
Additions & Remodeling Pros


 1 Enter ZIP Code

 2 Describe Project

 3 Get Quotes

Service Professional? Join HomeAdvisor to Get Leads Like These

Recent Job Requests for Addition & Remodeling Contractors in Essex Junction, VT:


Project: Add a Sunroom or Patio Enclosure
Date: 05/15/2019
Project Description: Build a new sunroom or enclosed patio or porch
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Property Owner: Yes
Comment: Looking for a simple screen porch with the option to add roll down plastic coverings from the inside for rain or pollen season.

Project: Remodel a Bathroom
Location: Essex, VT
Date: 05/13/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: I like to farm out the shower stall base to a professional. All other work I will do myself.

Project: Remodel a Bathroom
Date: 05/09/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: I am looking for estimates for a new bathroom. It would be a completely new structure being built. I would like this for outside. Please email me.

Project: Remodel a Garage
Date: 05/09/2019
Scope of Remodel: Completely remodel garage
Storage cabinets / shelving: No - I do not plan to add or update the cabinets / shelving
Garage doors: Yes - I plan to update the garage doors
Insulation: No - I do not plan to add insulation
Flooring: No - I do not plan to update the flooring
Electrical: No - I do not plan to update the lighting or electrical fixtures
Interior walls or drywall: Yes - I plan to add or remove walls or drywall
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Comment: I’m under contract for a raised ranch in which they converted the garage into a finished room. I want the garage back. There’s now a double-wide (~75 inch) door, but not a garage door at the entrance. I don’t know if this is even possible so I’m Pricing & talking to people

Project: Remodel a Basement
Date: 05/08/2019
Design Preparation: Sketches of basic idea of project
Basement Area Description: Unfinished
Square Footage: 400 - 800 (medium)
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Property Owner: Yes
Historical Work: No
Covered by Insurance: No
Comment: We have a unfinished basement that we could like to finish. Nothing fancy or crazy. The ceiling will be left unfinished so that we don't lose head space, we will just paint it. Corkboard flooring may be done by a flooring company. We just need dry wall put up in the basement, insulation and minor electrical wiring and a wall + door to section off a small portion of the basement. On one side of the basement some moisture does seep through so that wall needs to be painted with water resistant paint and paneling needs to be used along the bottom of that wall. I have a home inspection report you can see that has recommendations.

Project: Remodel a Garage
Date: 05/05/2019
Scope of Remodel: Organize garage space
Storage cabinets / shelving: Yes - I plan to add or update the cabinets / shelving
Garage doors: No - I do not plan to update the garage doors
Insulation: No - I do not plan to add insulation
Flooring: Yes - I plan to update the flooring
Electrical: Yes - I plan to update the lighting or electrical fixtures
Interior walls or drywall: No - I do not plan to add or remove walls or drywall
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Property Owner: Yes

Project: Remodel a Bathroom
Date: 05/04/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Comment: Primarily need to replace floor and partial subfloor due to leaking toilet damage. Build recessed medicine cabinet. Update vanity. Re-tile around tub and floor.

Project: Remodel or Renovate One or More Rooms
Date: 05/03/2019
Nature of project: Remodel / update a few rooms
Rooms to be Remodeled: Living room
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Comment: Remodel existing 18'x20' post & beam great room attached to house. Remove cracked concrete slab floor; install pink board insulation, extend radiant heat loop from existing boiler system, re-pour floor. Replace existing 2-wire electrical system with code-compliant wiring and lighting; extend same to adjacent garage. Spray polyurethane insulation into walls and ceiling. Install wallboard (including taping) or other suitable wall and ceiling covering. Insulate around and trim out existing windows. Coordinate with owner on initial wall and ceiling tear-out, final flooring installation, all painting.

Project: Remodel a Bathroom
Date: 05/02/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible

Project: Remodel a Bathroom
Date: 04/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Comment: We need an update to a '80's bathroom.