How much will your project cost?
Get Quotes Now

Electric Car Charger Installers in Staten Island, NY

Where do you need Electric Vehicle Charging Station Installation Pros?

How It Works

  1. Answer a few questions about your home project.
  2. Within seconds, get matched with top-rated local pros.
  3. Compare quotes and choose the best pro for the job.

Prescreened Electric Car Charging Station Installers in Staten Island, NY


Out of Network Vehicle Charging Station Installers in Staten Island, NY

Cost to Install an Electric Vehicle Charging Station in Staten Island, NY

  • Staten Island, New York Average
    $916
  • Typical Range
    $641 - $1,205
  • Low End - High End
    $355 - $2,000

More Pros Near Staten Island, NY

HomeAdvisor Community Rating

Overall Rating:

Staten Island Electricians are rated 4.7 out of 5 based on 116 reviews of 8 featured pros.

The HomeAdvisor Community Rating is an overall rating based on verified reviews and feedback from our community of homeowners that have been connected with service professionals. See individual business pages for full, detailed reviews.


Things to Consider Before You Install an Electric Car Charging Station in your Home:

  • What kind of location is this?
  • Have you already purchased an electric vehicle charging station?
  • Is the installation site prewired to support the required electrical load (typically referred to as 220v or 240v)?

Ideas & Inspiration from Staten Island Electrical Services

  • Item

    Completed Fences ...

  • Item

    This 8000 sq foot home was built along side the owners cottage. It sets along side beautiful wetlands in Staten ...

  • Item

    Existing front door hinging was incorrect. Ordered new door, corrected hinging and rehung. I am a certified window and ...

Are You a Quality Pro?

Find out how HomeAdvisor can help your business

Join Our Network

Get Leads Like These

Recent Requests for EV Charger Installation in Staten Island, New York:

  • Project Location: Staten Island, NY 10314
    Date: 06/2022
    Location: Home/Residence
    Already Purchased Station: No
    Supports 220v or 240v load: Yes
    Request Stage: Ready to Hire
    Desired Completion Date: Timing is flexible
  • Project Location: Staten Island, NY 10312
    Date: 06/2022
    Location: Home/Residence
    Already Purchased Station: Yes
    Supports 220v or 240v load: I don't know
    Request Stage: Planning & Budgeting
    Desired Completion Date: Timing is flexible
    Property type:: Multi-family residence
    Property Owner: Yes
    Comment: Hardwire installing electric vehicle charger
  • Project Location: Staten Island, NY 10314
    Date: 06/2022
    Location: Home/Residence
    Already Purchased Station: No
    Supports 220v or 240v load: I don't know
    Request Stage: Planning & Budgeting
    Desired Completion Date: Timing is flexible
    Property type:: Single Family
    Property Owner: Yes
  • Project Location: Staten Island, NY 10301
    Date: 06/2022
    Location: Home/Residence
    Already Purchased Station: No
    Supports 220v or 240v load: No
    Request Stage: Ready to Hire
    Desired Completion Date: Timing is flexible
    Property type:: Single Family
    Property Owner: Yes
  • Project Location: Staten Island, NY 10306
    Date: 06/2022
    Location: Home/Residence
    Already Purchased Station: No
    Supports 220v or 240v load: I haven't determined the installation site yet
    Request Stage: Planning & Budgeting
    Desired Completion Date: More than 2 weeks
    Comment: Super charger for evs
  • Project Location: Staten Island, NY 10314
    Date: 06/2022
    Already Purchased Station: Yes
    Supports 220v or 240v load: Yes
    Location: Home/Residence
    Request Stage: Planning & Budgeting
    Desired Completion Date: Timing is flexible
  • Project Location: Staten Island, NY 10314
    Date: 06/2022
    Location: Home/Residence
    Already Purchased Station: No
    Supports 220v or 240v load: I don't know
    Request Stage: Planning & Budgeting
    Desired Completion Date: Timing is flexible
  • Project Location: Staten Island, NY 10314
    Date: 05/2022
    Already Purchased Station: No
    Supports 220v or 240v load: I don't know
    Location: Home/Residence
    Request Stage: Planning & Budgeting
    Desired Completion Date: Timing is flexible
    Property type:: Multi-family residence
    Property Owner: Yes
    Comment: Looking for estimate to install Lv2 EV charging station, ideally outdoors in driveway
  • Project Location: Staten Island, NY 10314
    Date: 05/2022
    Location: Home/Residence
    Already Purchased Station: No
    Supports 220v or 240v load: I don't know
    Request Stage: Planning & Budgeting
    Desired Completion Date: Timing is flexible
    Property Owner: Yes
    Comment: I would like to get an estimate for charging station for an electric call.
  • Project Location: STATEN ISLAND, NY 10314
    Date: 05/2022
    Location: Home/Residence
    Already Purchased Station: Yes
    Supports 220v or 240v load: I don't know
    Request Stage: Ready to Hire
    Desired Completion Date: Timing is flexible
  • Project Location: Staten Island, NY 10309
    Date: 04/2022
    Location: Home/Residence
    Already Purchased Station: No
    Supports 220v or 240v load: I don't know
    Request Stage: Planning & Budgeting
    Desired Completion Date: Timing is flexible
    Property Owner: Yes
  • Project Location: Staten Island, NY 10309
    Date: 04/2022
    Location: Home/Residence
    Already Purchased Station: Yes
    Supports 220v or 240v load: I don't know
    Request Stage: Ready to Hire
    Desired Completion Date: 1 - 2 weeks
  • Project Location: Staten Island, NY 10308
    Date: 04/2022
    Location: Home/Residence
    Already Purchased Station: No
    Supports 220v or 240v load: No
    Request Stage: Planning & Budgeting
    Desired Completion Date: 1 - 2 weeks
    Property type:: Single Family
    Property Owner: Yes
    Comment: Would like 240 outlet installed outside in driveway to plug in car charger
  • Project Location: Staten Island, NY 10314
    Date: 04/2022
    Location: Home/Residence
    Already Purchased Station: No
    Supports 220v or 240v load: I haven't determined the installation site yet
    Request Stage: Planning & Budgeting
    Desired Completion Date: 1 - 2 weeks
    Property Owner: Yes
    Comment: I would like to get an estimate for company that install EV charging station.
  • Project Location: Staten Island, NY 10305
    Date: 03/2022
    Location: Home/Residence
    Already Purchased Station: No
    Supports 220v or 240v load: No
    Request Stage: Planning & Budgeting
    Desired Completion Date: 1 - 2 weeks
  • Project Location: Satan Island, NY 10301
    Date: 03/2022
    Location: Home/Residence
    Already Purchased Station: No
    Supports 220v or 240v load: No
    Request Stage: Ready to Hire
    Desired Completion Date: Timing is flexible
    Property type:: Multi-family residence
    Property Owner: Yes
    Comment: I would like to get an estimate for Electric Vehicle Charging Station Installation - Residential - Materials Not Provided We need six charges level 2
  • Project Location: NEW YORK, NY 10308
    Date: 03/2022
    Location: Home/Residence
    Already Purchased Station: Yes
    Supports 220v or 240v load: I don't know
    Request Stage: Planning & Budgeting
    Desired Completion Date: Within 1 week
    Comment: Install Tesla wall charger to the side of my home
  • Project Location: Staten Island, NY 10306
    Date: 03/2022
    Location: Home/Residence
    Already Purchased Station: No
    Supports 220v or 240v load: Yes
    Request Stage: Ready to Hire
    Desired Completion Date: Timing is flexible
  • Project Location: NEW YORK, NY 10308
    Date: 03/2022
    Location: Home/Residence
    Already Purchased Station: Yes
    Supports 220v or 240v load: I don't know
    Request Stage: Planning & Budgeting
    Desired Completion Date: Within 1 week
    Comment: Install Tesla wall charger to the side of my home
  • Project Location: Staten Island, NY 10307
    Date: 03/2022
    Location: Home/Residence
    Already Purchased Station: No
    Supports 220v or 240v load: No
    Request Stage: Planning & Budgeting
    Desired Completion Date: Within 1 week
    Property type:: Single Family
    Property Owner: Yes
    Comment: MY fuse box is 40ft from my garage. I need a 240V circuit installed to support a level2 charger. I have a finished basement and am looking for options.

References Available
Tell us your zip code to view pricing & schedule
Tell us your location to view pricing & schedule
Choose your project to view pricing & schedule

Please enter valid zip.

Please choose a location.

We're sorry but the time you have chosen is no longer available.
Please select a new time below:
does not provide service to View pros who serve this zip
Enter a zip code to view which pros serve this zip.
There was an issue connecting to the server. Please try again or call Customer Service at 1-877-800-3177.
We're sorry but the time you have chosen is no longer available.
Please select a new time below:

Select your appointment type and time:

Final Step - Confirm Your Appointment:

Confirm your appointment with on , - Change


Required
Required
Required
Required
 
 
 

By clicking Confirm Appointment, you affirm you have read and agree to the HomeAdvisor Terms & Conditions, and you agree and authorize HomeAdvisor and its affiliates, and their networks of Service Professionals, to deliver marketing calls or texts using automated technology to the number you provided above regarding your project and other home services offers. Consent is not a condition of purchase.