Recent Job Requests for Install or Replace a Shower Contractors in Hillsboro, Oregon:
Project Location:
Hillsboro,
OR
97123
Date: 05/09/2013
Type of shower install: Free-standing shower
Shower: Install a new shower (No existing shower)
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: No - I do not plan to install new tile
What kind of location is this?: Home/Residence
Historical Work: No
Desired Completion Date: 1 - 2 weeks
Request Stage: Planning & Budgeting
Part of larger remodel: No
Property Owner: Yes
Comment: re-pipe for shower pan and install, re-pipe for 2 sinks & install
Project Location:
Hillsboro,
OR
97124
Date: 09/2012
Type of shower install: Free-standing shower
Tile: Yes - I plan to install new tile
What kind of location is this?: Home/Residence
Historical Work: No
Desired Completion Date: Timing is flexible
Request Stage: Ready to Hire
Part of larger remodel: No
Property Owner: Yes
Comment: install shower pan, sink, toilet (all where fixures previously stood). tile floor.
Project Location:
Hillsboro,
OR
97123
Date: 04/2012
Historical Work: No
Desired Completion Date: 1 - 2 weeks
Request Stage: Planning & Budgeting
Property Owner: No
Comment: Qualified home buyer, planning to purchase a home using FHA/203k loan, seeks licensed contractor to bid on required uncovered during inspection (TBD) as well as bid on upgrades to Master Bath: -Replace tub/shower with drop-in soaking tub -Custom tile shower & tub surround with frameless hinged glass door -May also include replacing flooring with tile to match shower Due to lender requirements, homeowner is not permitted to perform any work, but if contractor is flexible, homeowner is willing to complete needed demo (may need 'first-timer' lessons). Also looking for contractor flexibility as homeowner would like to use recycled product where available and/or purchase cheap from overstocked renovators (glass door/tiles, maybe the tub). Home buyer looking to keep project expenses under $2000, if at all possible. Let me know if I'm out of my mind. ;]
Project Location:
Hillsboro,
OR
97123
Date: 01/2012
Type of shower install: Free-standing shower
Shower: Replace or move existing shower
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Historical Work: No
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Part of larger remodel: No
Property Owner: Yes
Comment: remove shower, install new, larger shower
Project Location:
Hillsboro,
OR
97124
Date: 04/2011
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Interested in Green Alternatives: No
Are you updating a shower or a bathtub?: Shower
Desired Completion Date: Less than 2 months
Comment: <br />My Master bedroom fiber glass shower enclosure has developed a crack on the base. Its a single unit and looks like it needs to be taken apart and new shower needs to be installed.
Project Location:
Hillsboro,
OR
97124
Date: 01/2011
Type of shower install: Shower / tub combo
Shower: Replace or move existing shower
Plumbing fixtures: No - I do not plan to install new plumbing fixtures
Tile: No - I do not plan to install new tile
Historical Work: No
Desired Completion Date: Within 1 week
Request Stage: Ready to Hire
Part of larger remodel: No
Property Owner: Yes
Comment: The flooring of my Fiberglas shower flexes which causes it come off the drain or to leak.
Project Location:
Hillsboro,
OR
97123
Date: 11/2010
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Interested in Green Alternatives: Yes
Are you updating a shower or a bathtub?: Shower
Desired Completion Date: Timing is flexible
Comment: Replacing double shower with a soaker tub.
Project Location:
Hillsboro,
OR
97123
Date: 09/2010
Type of shower install: Free-standing shower
Shower: Replace or move existing shower
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Historical Work: No
Desired Completion Date: Timing is flexible
Request Stage: Ready to Hire
Part of larger remodel: No
Property Owner: Yes
Comment: need an est to have a leak repaired.. in the fiberglass show and will need drywall repaired aslo
Project Location:
Hillsboro,
OR
97123
Date: 07/2010
Type of shower install: Free-standing shower
Shower: Replace or move existing shower
Plumbing fixtures: No - I do not plan to install new plumbing fixtures
Tile: No - I do not plan to install new tile
What best describes your need?: Urgent: Looking for help as soon as possible
Historical Work: No
Desired Completion Date: Within 1 week
Request Stage: Ready to Hire
Part of larger remodel: No
Property Owner: Yes
Comment: Current shower is leaking need to replace. Possible dry rot
Project Location:
Hillsboro,
OR
97124
Date: 01/2010
Consumer Owns Home: Yes
Are you updating a shower or a bathtub?: Shower
Request is for Commercial Location: No
Historical Work: No
Covered by Insurance: No
Desired Completion Date: Less than 2 months
Request Stage: Planning & Budgeting
Comment: finish tile work on bathroom shower.