Recent Job Requests for Install or Replace a Bathtub Contractors in Antioch, California:
Project Location:
Antioch,
CA
94509
Date: 04/2013
Bathtub: Replace or move existing bathtub
Historical Work: No
Desired Completion Date: Within 1 week
Request Stage: Ready to Hire
Property Owner: Yes
Project Location:
Antioch,
CA
94531
Date: 01/2013
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Interested in Green Alternatives: No
Are you updating a shower or a bathtub?: Both
Desired Completion Date: Timing is flexible
Comment: I want to replace Shower/Tub with a shower ony.
Project Location:
Antioch,
CA
94509
Date: 06/2012
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Interested in Green Alternatives: No
Are you updating a shower or a bathtub?: Both
Desired Completion Date: Timing is flexible
Project Location:
Antioch,
CA
94509
Date: 11/2011
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Interested in Green Alternatives: No
Are you updating a shower or a bathtub?: Both
Desired Completion Date: Less than 2 months
Comment: remodel so the house can be sold
Project Location:
Antioch,
CA
94509
Date: 09/2011
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Interested in Green Alternatives: Yes
Are you updating a shower or a bathtub?: Bathtub
Desired Completion Date: Timing is flexible
Comment: add shower to the tub
Project Location:
Antioch,
CA
94531
Date: 09/2011
Type of tub install: Whirlpool / jetted tub
Bathtub: Replace or move existing bathtub
Tile: Yes - I plan to install new tile
Historical Work: No
Desired Completion Date: Timing is flexible
Request Stage: Planning & Budgeting
Property Owner: Yes
Comment: Shower cabin and bathtub side by side, separated by the pipes enclosure. <br />These should be replaced by jet tub and possibly a new cabin
Project Location:
Antioch,
CA
94509
Date: 03/2011
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Interested in Green Alternatives: Yes
Are you updating a shower or a bathtub?: Both
Desired Completion Date: Less than 2 months
Comment: want to convert my current shower to a shower and bathtub adventure
Project Location:
Antioch,
CA
94531
Date: 01/2011
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Interested in Green Alternatives: Yes
Are you updating a shower or a bathtub?: Bathtub
Desired Completion Date: Timing is flexible
Comment: Convert existing bath tub with jacuzzi tube <br /><br />
Project Location:
Antioch,
CA
94509
Date: 12/2009
Consumer Owns Home: Yes
Are you updating a shower or a bathtub?: Bathtub
Request is for Commercial Location: No
Historical Work: No
Covered by Insurance: No
Desired Completion Date: Timing is flexible
Request Stage: Ready to Hire
Comment: reglasing of bathtub