Metal Stairs & Railing Pros in Saint Louis, MO (Missouri)

Where do you need Metal Stairs & Railings Install Pros?

Find Trusted Pros with HomeAdvisor ProFinder

Just tell us about your needs and we'll quickly match you to the pre-screened, Saint Louis Metal Stairs & Railing Pros you can trust to get the job done.

Install or Replace Metal Stairs and Railings

Reviews of Saint Louis Metal Stairs & Railing Pros

Know any great Metal Stairs & Railing Pros in the Saint Louis area? Let us know about them and you might be eligible to receive a Amazon.com gift certificate. Refer A Pro today!

Are You a Quality Pro? Join Our Network

Recent Job Requests for Install or Replace Metal Stairs and Railings Contractors in Saint Louis, Missouri:


New Lead
Project Location: 63118
Date: 08/28/2015
Type of Stairs: Interior, Straight
Stair Construction: Open on two sides (railings on both sides)
Type of Material: Don't Know
Width of Stairs: Less than 3 ft.
Request Stage: Planning & Budgeting
Desired Completion Date: 1 - 2 weeks
What kind of location is this?: Home/Residence
Historical Work: Yes
Property Owner: Yes
Comment: Interior: 2nd floor unit has about 17 feet of stairs on one side and a wall on the other side. The stair railing appears to be 2x4. I want something a little more updated. Exterior has 3 or 4 stairs towards the deck. The run and risers need replacing.

Project Location: 63116
Date: 08/19/2015
Request Stage: Ready to Hire
Desired Completion Date: 1 - 2 weeks
What kind of location is this?: Home/Residence
Comment: Outdoor railing for four steps.

Project Location: 63109
Date: 07/2015
Type of Stairs: Exterior, Straight
Stair Construction: Open on two sides (railings on both sides)
Type of Material: Don't Know
Request Stage: Ready to Hire
Desired Completion Date: 1 - 2 weeks
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: I need to have hand rails installed on existing front porch steps. The steps are concrete and are 3 to 4 feet wide. My tenant is elderly and needs hand rail support to get in and out of the house.

Project Location: 63114
Date: 06/2015
Type of Stairs: Spiral
Stair Construction: Open on one side (railing on one side, wall on the other)
Type of Material: Don't Know
Width of Stairs: Less than 3 ft.
Request Stage: Planning & Budgeting
Desired Completion Date: 1 - 2 weeks
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: Consultation and quote to install a spiral staircase

Project Location: 63116
Date: 06/2015
Type of Stairs: Exterior, Straight
Stair Construction: Other
Type of Material: Wrought iron
Width of Stairs: Other
Request Stage: Ready to Hire
Desired Completion Date: Within 1 week
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: take down existing broken outdoor hand rail and replace with wrought iron hand rail

Project Location: 63136
Date: 05/2015
Type of Stairs: Interior, Straight, Landing mid-stair, Closed riser
Stair Construction: Open on one side (railing on one side, wall on the other)
Type of Material: Wrought iron, Aluminum, Galvanized steel, Painted
Width of Stairs: Other

Project Location: 63130
Date: 05/2015
Type of Stairs: Exterior
Stair Construction: Open on no sides (railings on no sides, just a hand rail)
Type of Material: Wrought iron, Aluminum, Galvanized steel, Wooden handrail
Width of Stairs: 3-5 ft.
Request Stage: Planning & Budgeting
Desired Completion Date: 1 - 2 weeks
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: i have 3 outside steps that need a hand rail installed. iron would be best but we are open to options.

Project Location: 63136
Date: 04/2015
Type of Stairs: Interior, Straight
Stair Construction: Open on one side (railing on one side, wall on the other)
Type of Material: Wrought iron
Width of Stairs: Less than 3 ft.
Request Stage: Ready to Hire
Desired Completion Date: Within 1 week
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: railing on one side of stairs

Project Location: 63117
Date: 04/2015
Request Stage: Ready to Hire
Desired Completion Date: Within 1 week
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: Needing railing and steps

Project Location: 63117
Date: 04/2015
Type of Stairs: Exterior, Straight
Type of Material: Wrought iron
Width of Stairs: Other
Request Stage: Ready to Hire
Desired Completion Date: 1 - 2 weeks
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: Need hand rail down back steps (2) + 3 places in front of house (5 steps) (5 steps) (4 steps)

Project Location: 63141
Date: 03/2015
Type of Stairs: Interior, Straight
Stair Construction: Open on one side (railing on one side, wall on the other)
Type of Material: Bronze, Powder coated, Other, Don't Know
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: Replace existing wood ballusters and rails with black or nickel-finished ones, including an overlook that is 10 feet long.

Project Location: 63125
Date: 03/2015
Request Stage: Ready to Hire
Desired Completion Date: Within 1 week
What kind of location is this?: Home/Residence
Comment: I need an estimate on installing handrails in concrete.

Project Location: 63121
Date: 03/2015
Type of Stairs: Exterior
Type of Material: Don't Know
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Business
Historical Work: No
Property Owner: Yes
Comment: Metal railing to be installed on a concrete retaining wall to prevent anyone from falling over the retaining wall. This is located in a parking lot in the Town of Norwood Court.

Project Location: 63105
Date: 03/2015
Request Stage: Ready to Hire
Desired Completion Date: 1 - 2 weeks
What kind of location is this?: Business
Comment: I need an estimate to install a metal railing for commercial.

Project Location: 63139
Date: 02/2015
Type of Stairs: Exterior, Straight
Stair Construction: Open on two sides (railings on both sides)
Type of Material: Wrought iron
Width of Stairs: 5-7 ft.
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 weeks
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: Metal railing around the front porch

Project Location: 63104
Date: 01/2015
Type of Stairs: Interior, Open risers (no risers)
Stair Construction: Open on one side (railing on one side, wall on the other)
Type of Material: Raw steel, Wrought iron, Aluminum, Stainless Steel, Galvanized steel, Powder coated, Wood treads
Width of Stairs: 3-5 ft.
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: Contemporary new construction open air concept stairs to the second floor

Project Location: 63116
Date: 01/2015
Type of Stairs: Interior, Straight
Stair Construction: Open on one side (railing on one side, wall on the other)
Type of Material: Raw steel, Wrought iron, Painted, Wood treads
Width of Stairs: More than 7 ft.
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: Open Stairs leading to the upper floor

Project Location: 63117
Date: 11/2014
Type of Stairs: Exterior, Straight
Stair Construction: Open on one side (railing on one side, wall on the other)
Type of Material: Wrought iron, Aluminum
Width of Stairs: Other
Request Stage: Ready to Hire
Desired Completion Date: 1 - 2 weeks
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: Need 1 exterior railing on back porch stairs - 3 steps Need 1 exterior railing on front porch stairs - six steps Need 1 exeterior railing at each of two front walk steps - 4 steps each

Project Location: 63139
Date: 11/2014
Type of Stairs: Exterior, Spiral
Stair Construction: Open on two sides (railings on both sides)
Type of Material: Raw steel, Wrought iron, Aluminum, Stainless Steel, Galvanized steel
Width of Stairs: Less than 3 ft.
Request Stage: Planning & Budgeting
Desired Completion Date: Within 1 week
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: We need to get a quote on an emergency exit from a third floor apartment. I would like a metal spiral staircase.

Project Location: 63136
Date: 11/2014
Type of Stairs: Interior, Straight
Stair Construction: Open on one side (railing on one side, wall on the other)
Request Stage: Planning & Budgeting
Desired Completion Date: Within 1 week
What kind of location is this?: Home/Residence
Comment: Steps present older home approx 2 0 steps
 

Unscreened Metal Fabrication Contractors in Saint Louis, Missouri

Ashford
1619 North 20th Street
Saint Louis, MO 63106