Metal Stairs & Railing Pros in San Francisco, CA (California)

Where do you need Metal Stairs & Railings Install Pros?

Find Trusted Pros with HomeAdvisor ProFinder

Just tell us about your needs and we'll quickly match you to the pre-screened, San Francisco Metal Stairs & Railing Pros you can trust to get the job done.

Install or Replace Metal Stairs and Railings

Reviews of San Francisco Metal Stairs & Railing Pros

Project: Install or Replace Metal Stairs and Railings
San Diego, CA

Ray made handrails for me. He is pretty good at responding to questions and requests. He is open minded - listens to what customers want/need, considers suggestions, and can give good/better suggestions. He is careful delivering the finished product - carefully opened the handrails wrappers to avoid scratches. Overall I am happy with his work.

 
Are You a Quality Pro? Join Our Network

Recent Job Requests for Install or Replace Metal Stairs and Railings Contractors in San Francisco, California:


New Lead
Project Location: 92110
Date: 04/2015
Type of Stairs: Exterior, Spiral
Stair Construction: Open on two sides (railings on both sides)
Type of Material: Aluminum
Width of Stairs: 3-5 ft.
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: Would like to have a spiral staircase going from the second story deck go up to the rooftop deck.

Project Location: 92672
Date: 04/2015
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Business
Historical Work: No
Property Owner: Yes
Comment: The stairway is bolted to a wooden beam which has been damaged by water and needs to be replaced

Project Location: 94080
Date: 04/2015
Type of Stairs: Exterior
Stair Construction: Open on one side (railing on one side, wall on the other)
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Comment: This mobile user did not provide any additional comments.

Project Location: 92075
Date: 04/2015
Type of Stairs: Interior, Straight, Landing mid-stair
Stair Construction: Open on one side (railing on one side, wall on the other)
Request Stage: Ready to Hire
Desired Completion Date: Within 1 week
What kind of location is this?: Home/Residence
Comment: This mobile user did not provide any additional comments.

Project Location: 95134
Date: 03/2015
Type of Stairs: Exterior
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Business
Historical Work: No
Property Owner: Yes
Comment: Need est to install metal railing for a doc.

Project Location: 94109
Date: 03/2015
Type of Stairs: Exterior
Stair Construction: Other
Type of Material: Don't Know
Width of Stairs: Less than 3 ft.
Request Stage: Ready to Hire
Desired Completion Date: Within 1 week
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: i need a staircase for egress oe firescape in my 4 unit building in san franci

Project Location: 92108
Date: 03/2015
Type of Stairs: Interior, Straight
Stair Construction: Open on one side (railing on one side, wall on the other)
Type of Material: Don't Know
Width of Stairs: 3-5 ft.
Request Stage: Ready to Hire
Desired Completion Date: 1 - 2 weeks
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: No

Project Location: 92405
Date: 03/2015
Type of Stairs: Exterior, Straight
Stair Construction: Open on two sides (railings on both sides)
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Comment: This mobile user did not provide any additional comments.

Project Location: 92672
Date: 02/2015
Type of Stairs: Exterior
Stair Construction: Other
Type of Material: Wrought iron
Width of Stairs: More than 7 ft.
Request Stage: Ready to Hire
Desired Completion Date: Within 1 week
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: need new wrought iron railing fabricated

Project Location: 92629
Date: 01/2015
Type of Stairs: Exterior, Landing mid-stair
Stair Construction: Open on no sides (railings on no sides, just a hand rail)
Type of Material: Raw steel, Wrought iron
Width of Stairs: 3-5 ft.
Request Stage: Ready to Hire
Desired Completion Date: Within 1 week
What kind of location is this?: Business
Historical Work: No
Property Owner: Yes
Comment: We own a triplex in San Clemente and need a new staircase. It is a metal one now that is falling apart. We are happy to go with wood or whatever is most economical and works for the area. We are selling this building very soon. We got a demand notice by the city to replace the staircase. So this is now urgent. The address of the property is 153 West Escalones, San Clemente, CA 92672 Myself or Mike would like to talk with you today. I am out this morning but Mike should be around later this morning. Our phone 9496302485 We need your bid asap. Also we will have to pull permit on this, I believe it would be required by city.

Project Location: 94578
Date: 01/2015
Type of Stairs: Exterior
Stair Construction: Open on one side (railing on one side, wall on the other)
Type of Material: Don't Know
Width of Stairs: Other
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 weeks
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: No
Comment: Need a one-sided hand rail to help someone get up steps into residence.

Project Location: 94903
Date: 12/2014
Type of Stairs: Exterior, Straight
Stair Construction: Open on no sides (railings on no sides, just a hand rail)
Type of Material: Aluminum
Width of Stairs: 5-7 ft.
Request Stage: Ready to Hire
Desired Completion Date: More than 2 weeks
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: 40 ft ramp with few steps Ramp is concre and 4 ft wide . need to install metal grab rail for safety and comfort

Project Location: 95120
Date: 12/2014
Type of Stairs: Exterior, Straight
Stair Construction: Open on one side (railing on one side, wall on the other)
Type of Material: Don't Know
Width of Stairs: 5-7 ft.
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: No
Comment: Need to install a metal handrail at the entrance door as you climb up the ( 5 ) steps outside the house, the homeowners are elderly couple and need the railing for support as they climbing up the steps. I am a friend and a general contractor just trying to facilitate this project.

Project Location: 95123
Date: 11/2014
Type of Stairs: Exterior, Straight
Type of Material: Don't Know
Width of Stairs: 5-7 ft.
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 weeks
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: I need porch railings installed

Project Location: 94070
Date: 11/2014
Type of Stairs: Exterior, Other
Stair Construction: Open on one side (railing on one side, wall on the other)
Type of Material: Other
Width of Stairs: Other
Request Stage: Planning & Budgeting
Desired Completion Date: Within 1 week
What kind of location is this?: Business
Historical Work: No
Property Owner: Yes
Comment: handrail to go along the building entrance like 50 feet with support on the wall and on the floor

Project Location: 92405
Date: 11/2014
Type of Stairs: Other
Stair Construction: Other
Type of Material: Don't Know
Width of Stairs: Other
Request Stage: Ready to Hire
Desired Completion Date: 1 - 2 weeks
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: handrails for front porch

Project Location: 95139
Date: 11/2014
Type of Stairs: Interior, Landing mid-stair
Stair Construction: Open on one side (railing on one side, wall on the other)
Type of Material: Don't Know
Width of Stairs: 3-5 ft.
Request Stage: Ready to Hire
Desired Completion Date: 1 - 2 weeks
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: We need a railing put on our staircase. We are putting hardwood treads with white risers. We need to have a railing contractor set up to come in right after the stairs are resurfaced to minimize the time with no railing. We want post to post, painted wood newels, and metal balusters.

Project Location: 92127
Date: 11/2014
Type of Stairs: Interior
Stair Construction: Open on one side (railing on one side, wall on the other)
Type of Material: Don't Know
Width of Stairs: 3-5 ft.
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: need new hand rail and posts. Condo built in 1973. I removed handrail from portion below landing, need a new rail for that part & would like to replace railing for upper part so it matches.

Project Location: 94901
Date: 10/2014
Type of Stairs: Exterior, Spiral
Stair Construction: Open on two sides (railings on both sides)
Type of Material: Aluminum, Galvanized steel, Powder coated
Width of Stairs: Less than 3 ft.
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: Spiral staircase to replace old wooden one attached to outdoor deck.

Project Location: 92127
Date: 10/2014
Type of Stairs: Interior, Exterior, Landing mid-stair, Open risers (no risers)
Stair Construction: Open on two sides (railings on both sides)
Type of Material: Raw steel, Galvanized steel, Powder coated, Wood treads
Width of Stairs: 3-5 ft.
Request Stage: Ready to Hire
Desired Completion Date: 1 - 2 weeks
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: New house construction
 

Unscreened Metal Fabrication Contractors in San Francisco, California

SOLHER IRON
945 PALOU AVE
San Francisco, CA 94124