Top-rated basement remodelers.

Find top rated basement remodelers in your area

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Basement remodelers near you

Basement - Remodel FAQs

Finishing a basement turns unused square footage into livable space and returns up to 70% of what you spend when you sell your home. Beyond that resale boost, you gain a playroom, home office, or guest suite you can start enjoying right away. That mix of daily comfort and solid return on investment (ROI) makes basement finishing one of the smartest upgrades you can tackle.

In some parts of the country—especially lots on swamps, high water tables, or other wetlands—local codes prohibit basements. Saturated soil puts constant pressure on foundation walls and lets water seep in faster than any sump pump can handle. 

If your property sits on waterlogged ground, building on a slab or crawl space is often safer, more affordable, and code-compliant.

Most basements wrap up in four to eight weeks. Framing takes three to five days, with electrical and plumbing rough-ins following over the next week. Add five days for drywall, two to three for flooring, and another week for paint, trim, and punch-list items. 

Delays can happen if materials run late or your contractor’s calendar is packed, so build in a little cushion when you plan.

Whether a finished basement counts toward your home’s official square footage depends on local rules. Many areas only include below-grade space if it has code-approved egress, fully finished walls, ceilings, and floors, plus consistent heating. 

Check with your local assessor or building department before you start; meeting those standards can affect taxes, appraisals, and resale value.

Building codes require a checklist: dedicated heat and electrical service, a code-approved stairway, and at least one egress window or exterior door. Walls, ceilings, and floors must be fully finished and meet insulation, ventilation, and fire-separation standards. If you add a bedroom, you’ll also need a closet, proper clearances, and safe exits. If you change the layout later, be ready to update the space so every new room still meets today’s code.

The , homeowners’ guide to basement remodelings
From average costs to expert advice, get all the answers you need to get your job done.
new wine cellar built in basement of home
Mar 31, 2025
Mar 31, 2025
Explore wine cellar cost considerations with our guide to factors like bottle storage capacity, temperature and humidity control, and wine cellar design types.
new basement remodeled and finished out
Mar 22, 2025
Mar 22, 2025
Use this guide to budget for basement remodel costs based on factors such as basement size, labor costs, additions, and more.
Share project details to get started.