09/11/2019 I hired SouthEastern Construction and Rehab (SECR) from their location at FL. I spoke with salesman, Mike, he was very nice and helpful. Project overview: remodel of my 10x8 kitchen. Start date: 10/21/2019 End date: 03/04/2020 Initial Price: $22,500.00 Final cost = $23,950.00 The remodel was to replace the old and install new cabinets using soft close doors and drawers, quartz counter tops, glass backsplash, new lighting, and new sink. During demolition the old cabinets were removed and the floor underneath was at a different level because we did not replace the existing floor tiles. They were not able to get the sub floor right, so now in the final product you can see a large gap in front of the some of the lower cabinet bottoms. It was never filled, and I was told we can buy some type of grout and fill it. The electrician needed to run an additional home run line for the stove top which cost an additional $1,450.00 The electrician and the plumber were awesome. Although most of the people were very nice, it seemed they had difficulty with their jobs, so it took several visits and multiple people to complete each aspect of the job. The kitchen was not ready for Thanksgiving as I was originally told. 12/04/2019 Installation of the very beautiful quartz countertops, but the installers managed to scratch a small section by the sink, and they could not make the seam where the 2 pieces join *disappear*, so there is a visible crack. I was not home when the countertops were installed, so I did not have a chance to inspect them. At least at Chrtistmas we could use a part of the kitchen, all the cabinets were not finished. There were times when a week would pass with no one showing up to work. I called and texted the project manager Kyle, he was so overwhelmed with all his tasks, he simply could not handle it well. At times when I called him to ask when someone was coming in to finish up a job, he would say *oh I thought they finished*. He never seemed to know what his workers were doing or where they were in their efforts. We had 3 different guys do the back splash, which is crooked to this day but at first glance it is very nice. We had 2 different guys, (1 was an electrician) come in 5 or 8 times to straighten the cabinets, which are crooked to this day. Ricky is the main cabinet guy, and he is a very nice kid and is learning as he goes. I called the office manager, Martha Diaz, several times and was never answered. I left voice messages but my calls were never returned. The job was completed in mid Feb 2020, and still needs adjustments to fix the crooked drawers and doors that do not close without a push. Remember the kitchen is a tiny 10X8, so why did it took 5 months to complete in a sub-par fashion? Because it was mismanaged. I suggest Kyle start using a Gantt Chart to help manage projects and visualize milestones, scheduling, and tasks. Today my kitchen is far better than the 1950s kitchen that was replaced, I am not embarrassed to have people over, and I do like it. But in good conscience, I can not recommend SECR for a kitchen remodel.