A dream home becomes a nightmare. Signed a contract 10/14/2024 gave T6 construction Chris Thulin a wire transfer $30,000 and $14,270 draw at closing that he says he needed to get the project started. T6 took draws directly paid to them about $161,240 that should be used for work. Total funds released about $360,000 approximately 80 percent of total project costs. The initial permit was delayed 6 weeks because T6 failed to pay the deposit even though he had our money, T6 has done a bait and switch installing a cheaper furnace not in our contract and the wrong color windows that were cheaper. Chris has now changed the furnace and windows to the correct items after a long period of waiting. Chris Thulin has told us 7 times our house will close April, May, June , July , August, September. October and now it is November with no closing in sight. We had to extend the permit due to expiring and 3 loan extensions. The project has been defined systematic delays, broken promises, excuses, recorded lien on our property. 3 intent to liens, lack of financial transparency , and critical breach of contract. The winter is coming and the building department has instructed Chris Thulin it is crucial to complete outside of the house to be able to close. Unfortunately, we have no Siding even though he had our $18,000 deposit since December 2025, three deck/balconies not completed., gutters downspouts flashing, not completed and inside shower tiles, shelvings, mirrors , door handles, missing 2 exterior doors, final paint, shelving, toilets, shower doors, install mirrors , stairs, railings etc. The majority of the contractors have complained to us that T6 did not pay the full amount for completed work even though he has our money. We are worried more liens are coming. Chris refuses to give us lien waivers and receipts to verify where our money is spent. We complained to the BBB but he did not answer them and now his grade is a F with a prior complaint from another victim. We have no life because of all this stress and extra financial burden paying high interest construction loan, utilities taxes and etc. and we can t enjoy our house. Please help get our house completed asap and make sure all contractors are paid in full.