We found John Capestany on Angie?s list. We had the approved building permit when we started the interview process. We interviewed several contractors. John was one of only a few with experience in both remodeling and new structures. We chose First Choice Carpentry because John showed the most interest in our project. He seemed excited to make our dream kitchen come true. <br /> John & his team showed up bright & early the first day, and we passed our first inspection before the end of the first day! Within a week, we had drainage, and a new foundation. <br /> Shawn, the framer was wonderful. He asked me where, exactly where I wanted things, like the medicine cabinet, towel rack, t.p. holder, etc, so he could put extra support in the walls, while he was building the walls. He was very accommodating. Shawn also flared out the sides of the skylight in the kitchen. It increases the amount of light that comes into the room. It?s extra nice on raining days. I know the framing of a house dose not show, but that is where all the design of the house starts. First Choice Carpentry did a great job with the ?bones? of our house. <br /> There were a few surprises along the way, which is to be expected when tying into existing structures (our house is 50 years old). John and his team handled the rotten door ledge, the 3 pieces of soft plywood on the roof, whatever came up. There were no excessive delays in the schedule. I felt involved and informed by having weekly meetings with the architect and builder. John and his team worked well with the architect, and every one was very patient with me, answering all my questions, and I had a lot of questions; because although I watch a lot of DIY tv, I have never watched a house being built, in person before. <br /> Framing went quickly, and we had John?s roofer replace our existing roof at the same time as the roof for the addition. <br /> Roger, John?s electrician warned us, at our first meeting, that we may need to move and upgrade our electric meter, along with the circuit box; and that did turn out to be the case; however it was kind of expected, and did not cause much delay. The new meter & panel gives us twice as much capability, so we now have room to add more circuits later. Roger suggested that we may want more outdoor lighting in the future. Roger asked me where, exactly, I wanted the switches, & outlets. It is very nice to have an outlet to plug in the crock pot, waffle iron, rice cooker, or whatever I want to use, in every island. <br /> The plumbers & HVCA subs were also great. We put in a tankless water heater. I love it. The large soaking tub I picked out is so nice. The rough in plumbing took about a week. There was a leaky seal on the tankless water heater, it was fixed the very next day, unfortunately the inspector was there that day, and we did not pass that inspection that day, but the seal was replaced and we passed the inspection next time the inspector was here. This was the only inspection we did not pass the first time; every other inspection was passed the first time. <br /> After loud construction in the house, the day the insulation went in, it seemed extremely quiet. It only took a few hours. but it was a nice break from the noise. <br /> The drywall seemed to be the messiest, but I am told that is the nature of drywall mud. John?s crew cleaned as they went, and I got quite spoiled. They picked up their tools, and even swept the floors most days. <br /> <br /> In order to stay within our budget, we did all the painting ourselves, inside and out. It seemed to take a long time. When the house needs painting next time, we will hire painters. <br /> Christian, the finish carpenter, is a man of all trades. He installed the tub surround, and trimmed around it. We used my old pantry cabinet (from Ikea, many years ago), in the new bathroom for a linen closet. The doors never worked quite right, but Christian fixed them, and they finely work great. The bathroom vanity from Lowes, needed some assembly. Christian caulked and sealed everywhere. <br /> I am still gushing about the custom cabinets. It was my design, but Christian & Shawn built the cabinets of my dreams. We used every inch of space we could. I am so pleased with the results. <br /> All members of John?s team were on time, professional, courteous, & very skilled. The team also helped me to coordinate with the wood stove and floor people. <br /> <br /> We purchased a wood burning stove, and vinyl flooring from other companies, and the team from First Choice Carpentry worked with me to coordinate all parts of the project so they could blend smoothly. <br /> The project was finished in a timely manner. It took about 3 1/2 months to finish. <br /> This will be our last house, so we are glad we chose First Choice Carpentry; they did a great job. We have a beautiful new kitchen and second bathroom to use into retirement. <br />