Harrington Plumbing, Inc.

2009 Arundel Place, Mount Pleasant, SC 29464
(843) 881-0565
5.0 | 2 Verified Ratings
Is this your business?
Claim Your Listing
!

Please Note: This business is not a screened and approved member of HomeAdvisor.  Learn about our screening process

Business Information


QUICK FACTS

Business Hours

12:00 am - 12:00 am (Please call to confirm)

  • Credit Cards Accepted
  • Bilingual

SERVICES OFFERED

Plumbing

SERVICE AREA

Charleston

CREDENTIALS

State Licensing

Trade:

License #: 1364

Expiration: Wed Jun 29 18:00:00 MDT 2011

BUSINESS OVERVIEW

Harrington Plumbing, Inc. is a family owned and operated business. We will be there for all of your family's plumbing needs. Complete safisfaction is our goal! Thank you.

Get Quotes
From up to 3 Prescreened
Plumbing Pros


 1 Enter ZIP Code

 2 Describe Project

 3 Get Quotes

Ratings & Reviews

Harrington Plumbing, Inc.
Showing 1-2 of 2
  Page 1 of 1  
Sort by newest   Date ▼   Rating  
5.0   |  
Review by in Isle Of Palms, SC
James came when he said he would, fixed my sump, and charged me a reasonable fee. A
Was this review helpful?  
5.0   |  
The job was completed in a timely manner and the rate was exactly as priced. Very nice company to work with.
Was this review helpful?  
Showing 1-2 of 2
  Page 1 of 1  

Service Professional? Join HomeAdvisor to Get Leads Like These

Recent Job Requests for Plumbers in Mount Pleasant, SC:


Project: Install or Replace a Shower
Date: 06/15/2018
Type of shower install: Steam shower
Shower: Install a new shower (No existing shower)
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Part of larger remodel: No
Request Stage: Ready to Hire
Desired Completion Date: 1 - 2 weeks
Historical Work: No
Property Owner: Yes
Comment: might need it remodels

Project: Install or Replace a Shower
Date: 06/15/2018
Toilet: No - I will keep the existing toilet as is
Shower / Bath: Yes - I want to move or install a new shower or bath
Countertops: No - I do not plan to update the countertops
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Flooring: No - I do not plan to update the flooring
Sinks: No - I do not plan to update the sinks
Request Stage: Ready to Hire
Property Owner: Yes
Desired Completion Date: Less than 2 months
Covered by Insurance: No
Are you updating a shower or a bathtub?: Shower
Requires Work on Historical Structure: No
Request for Commercial Location: No
Comment: So far, no one is interested in such a small job. Want to replace the shower surround and maybe the plumbing fixtures. Hope you can help.

Project: Install or Replace a Bathtub
Date: 06/15/2018
Type of tub install: Free-standing (clawfoot, legged)
Bathtub: Replace or move existing bathtub
Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Part of larger remodel: No
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Historical Work: No
Property Owner: Yes

Project: Install, Repair or Replace Plumbing or Fixtures
Date: 06/14/2018
What type of toilet?: Standard flow toilet
Plumbing Repairs: Toilet keeps running
For installs, have you already bought the toilet?: Yes
What kind of location is this?: Home/Residence
After Business Hours: No
Historical Work: No
Property Owner: Yes
Desired Project Start Date: Today
Comment: Toilet keeps running after flushing

Project: Install or Replace a Shower
Date: 06/13/2018
Shower: Replace or move existing shower
Plumbing fixtures: No - I do not plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Part of larger remodel: No
Request Stage: Ready to Hire
Desired Completion Date: More than 2 weeks
Historical Work: No
Property Owner: Yes
Comment: I would like to install a steam shower in the existing space but also correct a shower leak in the process (in the master shower). I would like the project done in late July.

Project: Install or Replace a Water Heater
Date: 06/11/2018
Type of Water Heater: Don't Know
Type of heat source : Natural gas
Is this an emergency?: No
Request Stage: Planning & Budgeting
Desired Completion Date: 1 - 2 weeks

Project: Install, Repair or Replace Plumbing or Fixtures - For Business
Date: 06/11/2018
Project Description: Repair a faulty plumbing item
Plumbing Repairs: Item is loose
Plumbing Fixtures: Toilet
What kind of location is this?: Business
After Business Hours: No
Historical Work: No
Property Owner: Yes
Desired Project Start Date: Tomorrow
Comment: Toilet is extremely loose. Cannot tighten bolts

Project: Install, Repair or Replace Plumbing or Fixtures
Date: 06/10/2018
Project Description: Find and/or fix a leak
Plumbing Repairs: Leaking pipe, Noisy pipes, Clogged/slow drain
Plumbing Fixtures: Pipe
What kind of location is this?: Home/Residence
After Business Hours: Yes
Historical Work: No
Property Owner: Yes
Desired Project Start Date: Today
Comment: Water from kitchen sink drain is leaking foul smelling water into laundry room.

Project: Install or Replace a Bathtub
Date: 06/09/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Are you updating a shower or a bathtub?: Bathtub
Comment: Would like to have existing tub and tile surround removed and have an acrylic or fiberglass shower installed.

Project: Install or Replace a Shower
Date: 06/08/2018
Toilet: No - I will keep the existing toilet as is
Shower / Bath: Yes - I want to move or install a new shower or bath
Countertops: No - I do not plan to update the countertops
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Flooring: No - I do not plan to update the flooring
Sinks: No - I do not plan to update the sinks
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Are you updating a shower or a bathtub?: Shower
Comment: Currently have a bathtub enclosure. Need a Walk-in shower to accomadate my husband . He is in a Rehab Center now, but will be released in less than two weeks.