Raycorp, Inc.

16345 S. Harlem Ave., Suite 4 Sw, Tinley Park, IL 60477
(708) 429-6644
Is this your business?
Claim Your Listing
!

Please Note: This business is not a current member of the HomeAdvisor network.  Learn about our screening process

Business Information


QUICK FACTS

Business Hours

12:00 am - 12:00 am (Please call to confirm)

  • Free Estimates
  • Credit Cards Accepted
  • Bilingual

SERVICES OFFERED

Additions & Remodeling

SERVICE AREA

Chicago

BUSINESS OVERVIEW

Whether you're moving up the corporate ladder or scaling down to enjoy your retirement, our homes will fit your plans for carefree living. Enjoy the equity-building advantages of home-ownership with the amenities normally reserved for expensive homes such as an oversized garage, garden patios or verandas, a beautiful pool area, fitness center, and a large lounge. At Raycorp, Inc. communities, you will have time to enjoy yourself because your home is maintenance-free!

Get Quotes
From up to 3 Prescreened
Additions & Remodeling Pros


 1 Enter ZIP Code

 2 Describe Project

 3 Get Quotes

Service Professional? Join HomeAdvisor to Get Leads Like These

Recent Job Requests for Addition & Remodeling Contractors in Tinley Park, IL:


Project: Remodel a Basement
Location: Tinley Park, IL
Date: 07/15/2019
Basement Features: Bedroom(s)
Design Preparation: None
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence

Project: Remodel a Kitchen
Location: Tinley park, IL
Date: 07/12/2019
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes
Comment: knock down a wall for an open layout. New cabinets and a island

Project: Remodel a Bathroom
Location: Tinley Park, IL
Date: 07/10/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: Yes
Request for Commercial Location: No
Comment: The bathroom has been gutted due to water damage. Part of the dry wall will need to be replaced. The cement floor needs to be leveled before tile can be put down. Install of shower stall, toliet and new vanity, countertop and sink.

Project: Remodel a Garage
Date: 07/08/2019
Scope of Remodel: Completely remodel garage
Storage cabinets / shelving: No - I do not plan to add or update the cabinets / shelving
Garage doors: No - I do not plan to update the garage doors
Insulation: No - I do not plan to add insulation
Flooring: Yes - I plan to update the flooring
Electrical: No - I do not plan to update the lighting or electrical fixtures
Interior walls or drywall: Yes - I plan to add or remove walls or drywall
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Property Owner: Yes

Project: Remodel a Bathroom
Location: Tinley Park, IL
Date: 07/07/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible

Project: Remodel or Renovate One or More Rooms
Location: TINLEY PARK, IL
Date: 07/07/2019
Project Description: Other
Design Preparation: None
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence

Project: Remodel a Kitchen
Location: Tinley Park, IL
Date: 07/04/2019
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: No - I do not plan to update the lighting
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Comment: I am looking to remodel and change my old cabinets. I will be buying cabinets from Ikea unless you have other recommendations. I would like to start the project as soon as possible

Project: Remodel a Bathroom
Location: Tinley Park, IL
Date: 07/03/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: We would like to replace vanity, fixtures, mirror, flooring and toilet in our bathroom

Project: Remodel a Bathroom
Location: Tinley Park, IL
Date: 07/02/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Comment: The house was built in the early 50s plumbing that’s in the crawl space needs to be updated., which includes the existing shower valve. And would like to add a walk in shower to an existing 1/2 bath.

Project: Remodel a Bathroom
Location: Tinley Park, IL
Date: 06/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: bathroom gutted down to the 2x4, no walls, no floors no bathroom fixtures.